Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Wasitah District

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Wasitah District

We provide bathroom waterproofing before tiling in the Al Wasitah district, with a continuous layer on the floor and wet-prone walls before adhesive and tiles. The work begins with photos sent by call or WhatsApp.

The district is made up of mid-sized houses and residential compounds, where bathrooms are often compact and splashing around the shower is common. Repeated wetting reaches the lower walls if the floor and joints are unprotected. Treatment therefore focuses on the floor edges and the base of the walls as well as the full area.

  • Al Wasitah is a district in the Eastern Province, close to Al Thulaythiyah, Ar Rafiah and Al Marbidia.
  • In compact bathrooms splash concentrates near the shower, and damage often starts along the floor edges there.
What the service includes

The bathroom waterproofing before tiling work in Al Wasitah District

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

From first contact to the finished job in Al Wasitah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Al Wasitah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bathroom waterproofing before tiling in Al Wasitah DistrictWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Wasitah District

Is it only the shower floor that needs waterproofing, or the whole bathroom?

It depends on the photos and how far the wetting spreads. The whole bathroom is usually treated because water moves beneath the tiles, and the exact extent is set after reviewing the condition.

How do I describe my bathroom in Al Wasitah before sending it?

Photograph the floor, the shower edges and the base of the walls, and note any place showing damp or dark staining, as this helps us judge the condition accurately.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Al Wasitah District within your service area?

Yes, Al Wasitah District is one of the areas we work in, as are Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District. To start, call us or message us on WhatsApp.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

Areas near Al Wasitah District

We also offer bathroom waterproofing before tiling in Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District, among the closest areas to Al Wasitah District.

Other services in the area

More services in Al Wasitah District

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Wasitah District?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp