Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Wasitah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Wasitah District

We provide bitumen bathroom waterproofing in Al Wasitah District in Hofuf, beginning with photos of the floor and wall bases sent by call or WhatsApp. Bitumen is laid before the screed and tiles to protect what lies beneath from water.

The district is made up of low houses and newer homes, and its bathrooms range from recent builds to ones altered years later. A bathroom retiled over an old floor needs its joints checked closely. The photos will show whether treating the corners is enough or the whole floor needs lining.

  • Al Wasitah is a district of Hofuf in Al-Ahsa, Eastern Province, near Al Thulaythiyah, Ar Rafiah and Al Marbidia.
  • New tiles laid over an old floor can hide weak joints, so leaks may only appear after the layers are in place.
What the service includes

The bitumen bathroom waterproofing work in Al Wasitah District

  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
How we work

This is how we work in Al Wasitah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Wasitah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Wasitah District and around itIncluding Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Wasitah District

Can a bathroom be lined without removing old tiles in Al Wasitah?

It depends on whether the tiles are firm and well bonded. If they are secure, work can proceed over them; if loose, they must come up, which the photos will reveal.

What sets bathrooms in Al Wasitah apart?

Changes build up over time there, so a floor can carry more than one layer. The layers beneath the tiles are therefore examined before any lining.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Do you offer bitumen bathroom waterproofing in Al Wasitah District?

Yes. Al Wasitah District is within our service area in the Eastern Province, and we also work in Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District. Call us or send photos of the spot on WhatsApp.

Nearby areas

The same service in nearby areas

We also work near Al Wasitah District, in Al Thulaythiyah District, Ar Rafiah District and Al Marbidia District.

Other services in the area

More services in Al Wasitah District

Pool at night with water jets after waterproofing

Your first step in Al Wasitah District:
a call or a WhatsApp message

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp