
Pool waterproofing before tiling in Al Madaris
Pool waterproofing before tiling in Al Madaris begins with photos of the pool sent via WhatsApp or call. The district has homes and villas of varying ages and sizes, some with private pools in the yard or garden.
In a residential district like Al Madaris, an owner may find an old pool in the yard needing full renewal. Old concrete may have cracks in the floor and walls, joints may be weak and old pipes may be damaged. Before new tiling, all these points must be treated to prevent water seeping through gaps and cracks. Newer pools may only need the waterproofing layer renewed. Photos show whether the pool needs simple work or deep treatment.
- Al Madaris is a district in the Eastern Province, near Ad Doij and Al Madani, with various residential homes and villas.
- Residential districts may have pools built decades ago with hidden leak paths that only show after new tiling.
The pool waterproofing before tiling work in Al Madaris
- Closing feed and drain pipe inlets and light fitting openings
- Applying the waterproof layer across the floor, walls and pool rim
- Checking the layer is complete before tiling is allowed to begin
- Treating corners and pour joints with a suitable compound
From first contact to the finished job in Al Madaris
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Al Madaris is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Al Madaris and around itIncluding Ad Doij, Al Madani and Mayyas, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Madaris
Can leak locations in an old pool be identified before work begins?
Yes, photos and inspection reveal visible cracks and weak joints. Some leaks only appear under water pressure, but thorough treatment before tiling protects against most cases.
Must the pool be completely emptied before waterproofing and tiling?
Yes, the pool must be completely empty so the concrete can be properly treated and waterproofing applied to a dry surface. This ensures new tiles rest on a properly sealed surface.
What decides the cost of waterproofing a pool before tiling?
The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Do you offer pool waterproofing before tiling in Al Madaris?
Yes. Al Madaris is within our service area in the Eastern Province, and we also work in Ad Doij, Al Madani and Mayyas. Call us or send photos of the spot on WhatsApp.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
More services in Al Madaris


