
Pool waterproofing before tiling in Al Madani
We waterproof pool shells in Al Madani before tiling, once we have seen photos of the pool, its corners and pipe inlets, sent by call or WhatsApp. The concrete and joints are treated first, and the tile adhesive goes on afterwards.
Al Madani is a residential district with a mix of older and newer homes, and some yards have room for a small or medium pool. An older concrete pool may carry cracks at the joints, while a newer one may only need an initial lining. The photos show which case applies to your pool.
- Al Madani is a district in the Eastern Province, close to Al Jarrari, Al Madaris and Bab Madinah Ash Shamal, with residential homes both old and new.
- In older pools cracks usually appear at the joints, so these are treated before any new layer.
The main items of pool waterproofing before tiling in Al Madani
- Applying the waterproof layer across the floor, walls and pool rim
- Inspecting the concrete and locating cracks and hairline cracks
- Treating corners and pour joints with a suitable compound
- Closing feed and drain pipe inlets and light fitting openings
From first contact to the finished job in Al Madani
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.
Your request from Al Madani comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Madani is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in Al Madani
Can an old pool in Al Madani be waterproofed without demolition?
In many cases yes, when the concrete is sound. Joints and cracks are treated first and the lining follows, and the photos show whether the structure can take it.
Does every pool in Al Madani need a full lining?
No, some pools only need localised joint treatment. The decision rests on the actual state of the concrete as the photos reveal it.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
What should I send you from Al Madani?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Madani, and we will work out the next step with you.
Areas near Al Madani
If the site is outside Al Madani, the same service is available in Al Jarrari, Al Madaris and Bab Madinah Ash Shamal.
More services in Al Madani


