Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Jarrari

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Jarrari

Pool waterproofing before tiling in Al Jarrari starts with photos of the pool, its corners and its joints, sent by call or WhatsApp. Al Jarrari is a residential district in Al-Ahsa close to Bab Madinah Ash Shamal and Mayyas, with a mix of homes and villas.

Homes in Al Jarrari range from courtyard houses to newer villas, and pools may sit in an inner courtyard or a back garden. Pools set against outer walls need particular attention at their joints. Drain and feed inlets are treated before adhesive and tiles are laid. The photos show the nature of each pool and the position of every joint before a method is agreed.

  • Al Jarrari is a residential district in Al-Ahsa in the Eastern Province, lying near Bab Madinah Ash Shamal and Mayyas.
  • Drain and feed inlets in a pool are points that need separate treatment before tiling.
What the service includes

The pool waterproofing before tiling work in Al Jarrari

  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
How we work

The steps of pool waterproofing before tiling in Al Jarrari

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in Al JarrariWe choose the method and the materials once we know the condition of the spot.

Al Jarrari is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jarrari

Can a pool built in an inner courtyard in Al Jarrari be waterproofed?

In most cases yes, though it depends on how easily the walls and floor can be reached. Send photos from several angles so we can tell whether the work is straightforward or needs special arrangement.

Do you treat the drain inlets in Al Jarrari pools?

Yes, we treat drain and feed inlets before adhesive and tiles go on. Send a photo of each inlet along with the pool so we can settle the right steps.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Is Al Jarrari within your service area?

Yes, Al Jarrari is one of the areas we work in, as are Bab Madinah Ash Shamal, Mayyas and Al Madani. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Jarrari, in Bab Madinah Ash Shamal, Mayyas and Al Madani.

Other services in the area

More services in Al Jarrari

Mosaic-tiled seaside pool

We start with you in Al Jarrari
with one call

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp