Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Ad Doij

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Ad Doij

Pool waterproofing before tiling in Ad Doij starts with photos of the pool and concrete condition sent by WhatsApp or call. Ad Doij has simple villas and apartment buildings, many with private pools needing treatment before tiles are laid.

Ad Doij has simple villas and medium-sized apartment buildings, many of whose villas contain concrete pools of varying ages. Concrete in older pools often shows slow leakage and cracks where the floor meets the walls. Constant heat and humidity affect the concrete's durability and bonded materials. Studying your photos helps us understand the pool's condition and decide the treatment level needed before tiling.

  • Ad Doij is a residential district in the Eastern Province near Umm Al Jazm, Al Madaris and Mayyas, with simple villas and apartment buildings.
  • Pools in small simple villas may be closer to ground level and are affected by moisture changes around the concrete base.
What the service includes

The scope of the work in Ad Doij

  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
  • Treating corners and pour joints with a suitable compound
How we work

The stages of the work in Ad Doij

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Your request from Ad Doij comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Ad Doij and around itIncluding Umm Al Jazm, Al Madaris and Mayyas, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing before tiling in Ad Doij

Do pools in simple villas in Ad Doij need different treatment?

The principle is the same, but details may differ. If the pool is close to ground level, the concrete may be affected by moisture from below. Photos show the location and condition, helping us choose suitable treatment.

Can you waterproof a pool if the concrete is damp from groundwater?

It depends on the moisture level. If dampness is severe and constant, you may need additional treatment. Photos and location details help us understand the situation and tell you what can be done.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Is Ad Doij within your service area?

Yes, Ad Doij is one of the areas we work in, as are Umm Al Jazm, Al Madaris and Mayyas. To start, call us or message us on WhatsApp.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

Areas near Ad Doij

We also offer pool waterproofing before tiling in Umm Al Jazm, Al Madaris and Mayyas, among the closest areas to Ad Doij.

Other services in the area

More services in Ad Doij

Mosaic-tiled seaside pool

Tell us about your site in Ad Doij
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp