Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Ad Doij

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Ad Doij

Cementitious pool waterproofing in Ad Doij begins with photos sent by call or WhatsApp. The district has houses and apartment blocks, many newly built with pools, and concrete condition depends on age and use.

Relatively new pools in Ad Doij may show minor seepage through concrete walls or at joints between floor and walls. The flexible cement coating covers the entire surface, seals fine cracks and anchors tiles and marble in place. The dry inland climate reduces stress on the coating, but direct heat on an exposed pool requires a material that tolerates expansion and contraction. Photos determine whether the concrete needs deeper crack treatment first.

  • Ad Doij is a district in the Eastern Province, close to Umm Al Jazm, Al Madaris and Mayyas, with houses and residential blocks.
  • Private pools in newer homes need a coating that bonds concrete and tiles and tolerates the temperature swings between day and night.
What the service includes

The main items of cementitious pool waterproofing in Ad Doij

  • Applying the flexible cementitious layer over the whole shell
  • Closing return pipe openings and drain outlets before the coating goes on
  • Checking the pool walls and floor and locating cracks and openings
  • Treating hairline cracks and the wall-to-floor junction
How we work

From first contact to the finished job in Ad Doij

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Start from Ad Doij with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Ad Doij is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cementitious pool waterproofing in Ad Doij

Can cement coating fix a small leak in a newer pool in Ad Doij?

Yes if the leak comes through concrete walls or joints. The coating seals hairline cracks, but the pool must be empty and dry. Send photos of where it leaks and of the walls and floor to decide the method.

How much heat can the cement coating tolerate in an open pool in Ad Doij?

The flexible coating tolerates heat swings and direct sun, but it depends on the material and thickness. Photos and inspection show what suits your pool based on its location and sun exposure.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Do you cover Ad Doij?

Yes. We serve Ad Doij and nearby areas such as Umm Al Jazm, Al Madaris and Mayyas, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know if the concrete is ready for the cementitious coating?

The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Umm Al Jazm, Al Madaris and Mayyas.

Other services in the area

More services in Ad Doij

Empty seaside pool during waterproofing

In Ad Doij and need cementitious pool waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp