Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Jubayl (near Ghizlan)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Jubayl (near Ghizlan)

Pool waterproofing before tiling in Al Jubayl starts with photos sent by call or WhatsApp. The city has villas, apartment blocks and private compounds, many with pools in gardens or yards, and conditions vary depending on the age of the concrete and any existing cracks.

Al Jubayl mixes older villas with modern residential buildings, so its pools vary widely in design and condition. An older concrete pool often shows hairline cracks on the floor and walls and at the corners, while a newer one may only need joint work around pipe entries. Sun and the harshness of nearby salt water stress exposed concrete, and moisture may leave marks around the base. Photos reveal the cracks and joints that need treatment before tiling can begin.

  • Al Jubayl is a city in the Eastern Province, near Al Merqab, Al Dana and Al Safat, with villas, blocks and gardens.
  • A pool in a garden or yard faces direct sun all year, so the concrete treatment must tolerate both heat and water.
What the service includes

The scope of the work in Al Jubayl (near Ghizlan)

  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

From first contact to the finished job in Al Jubayl (near Ghizlan)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Al Jubayl (near Ghizlan) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Jubayl (near Ghizlan) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Al Jubayl (near Ghizlan)

Can an old pool be waterproofed before tiling without replacing all the concrete?

In many cases yes, if the base concrete is sound. Cracks, corners and joints are treated, and a waterproof layer goes over the whole surface before tiling. The photos will show whether the structure needs deeper work.

Do you waterproof pools in private villas and compounds in Al Jubayl?

Yes, we serve Al Jubayl. Send us photos of the pool from different angles and tell us about any cracks or damp marks so we can work out what needs treatment before the tiles go on.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

How do I request pool waterproofing before tiling in Al Jubayl (near Ghizlan)?

Call us, or send clear photos of the spot and its location in Al Jubayl (near Ghizlan) on WhatsApp, and we will work out the next step with you.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

We also offer it in neighbouring areas

We also offer pool waterproofing before tiling in Al Merqab, Al Dana (near Ghizlan) and Al Safat, among the closest areas to Al Jubayl (near Ghizlan).

Other services in the area

More services in Al Jubayl (near Ghizlan)

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Jubayl (near Ghizlan)?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp