
Pool waterproofing after tiling in Al Jubayl (near Ghizlan)
Pool waterproofing after tiling in Al Jubayl starts with a photo of the pool and the leak location, sent by call or WhatsApp. This coastal city has pools in residential compounds, hotels and public parks, and the photos show where cracks and leaking joints are so we can choose the right repair.
Coastal pools in Al Jubayl face constant water pressure, intense heat and salt humidity. Leaks usually appear at tile joints, corners and around drain and feed openings, and may come from cracks beneath the surface in the concrete. Some pools are old with worn tiles, others are newer but have weak joints. The photos show how bad the leak is and whether it is only at the joints or goes deeper.
- Al Jubayl is a coastal city in the Eastern Province, next to Al Merqab, Al Dana and Al Safat, with residential compounds and public pools.
- Sea salt and high humidity speed up the wear on tiles and joints in coastal pools.
The scope of the work in Al Jubayl (near Ghizlan)
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Testing the leak area with dye and pressure-checking the lines
- Closing pump, light and return fittings from inside
- Watching the water level after filling to confirm the leak is closed
From first contact to the finished job in Al Jubayl (near Ghizlan)
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.
Your request from Al Jubayl (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Pool waterproofing after tiling in Al Jubayl (near Ghizlan)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on pool waterproofing after tiling in Al Jubayl (near Ghizlan)
If a pool in Al Jubayl leaks, how do we find where the leak comes from?
Send clear photos of the pool inside and out, and tell us where you see water seeping or leaking. The photos show us the location of cracks and weak joints and the state of the tiles and concrete, so we can pinpoint the leak source before we fix it.
Can an old pool in Al Jubayl be waterproofed without removing the tiles?
It depends on where the leak is and how bad it is. If the leak is at the joints and surface cracks, yes, but if it is in the concrete under the tiles, we may need other steps. The photos show the condition and help us decide with you.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
What decides the cost of waterproofing a pool after tiling?
The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
How do I request pool waterproofing after tiling in Al Jubayl (near Ghizlan)?
Call us, or send clear photos of the spot and its location in Al Jubayl (near Ghizlan) on WhatsApp, and we will work out the next step with you.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
We also offer it in neighbouring areas
Nearby areas we also cover: Al Merqab, Al Dana (near Ghizlan) and Al Safat.
More services in Al Jubayl (near Ghizlan)

