Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Dana (near Ghizlan)

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Dana (near Ghizlan)

Pool waterproofing before tiling in Al Dana begins with photos of the basin, floor and walls sent by call or WhatsApp. The district has residential villas and small apartment buildings with private pools, where new concrete usually needs treatment before pool tiling.

Al Dana features relatively newer villas and small residential buildings, each possibly with a private basin. New basins develop fine cracks around joints between walls and floor and at pipe inlets due to concrete exposure to water and sun. Nearby coastal humidity increases the chance of seeping outside the basin, which can damage the foundation or surrounding walls. Treating the basin before tiling ensures water stays inside and does not seep to surrounding areas.

  • Al Dana is a residential district in the Eastern Province, near Al Safat, Al Jubayl and Al Wahah.
  • New concrete basins often show minor seeping at joints during their first full season of use.
What the service includes

The pool waterproofing before tiling work in Al Dana (near Ghizlan)

  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
How we work

This is how we work in Al Dana (near Ghizlan)

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Start from Al Dana (near Ghizlan) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Dana (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Dana (near Ghizlan)

Should a new pool basin in Al Dana be waterproofed right before tiling?

Yes, after the concrete has set and right before tiling. This allows treatment of cracks, joints and critical areas while the surface is clean and dry. Send photos of the new basin and tell us when you plan to start tiling so we can help with timing.

What happens if water seeps from an untreated basin in Al Dana?

Water may seep into the foundation or surrounding walls, causing damp and cracking in the structure. Later repairs are harder and costlier than prior treatment. Treating now protects the house from future damage and extends the basin's life.

Do you cover Al Dana (near Ghizlan)?

Yes. We serve Al Dana (near Ghizlan) and nearby areas such as Al Safat, Al Jubayl (near Ghizlan) and Al Wahah (near Ghizlan), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

Areas near Al Dana (near Ghizlan)

Nearby areas we also cover: Al Safat, Al Jubayl (near Ghizlan) and Al Wahah (near Ghizlan).

Other services in the area

More services in Al Dana (near Ghizlan)

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Al Dana (near Ghizlan)?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp