
Pool waterproofing before tiling in Al Jawahir
We treat pools in Al Jawahir before tiling after reviewing photos of the pool and its water inlets, which you send by call or WhatsApp. The district holds villas and homes with gardens, and each pool there has its own condition.
Al Jawahir holds villas and homes with wide gardens, and its pools range from older to newer. An older pool usually shows cracks at the corners and around water inlets, where pressure concentrates, while a newer one may need full lining before tiling. The sun stresses exposed surfaces across the day, so the lining is chosen after the photos are reviewed.
- Al Jawahir is a district in the Eastern Province with villas and homes that have gardens, close to An Nasirah, Az Zarah and Al Husain.
- Stress concentrates at water inlets, so those points are checked carefully before lining.
The pool waterproofing before tiling work in Al Jawahir
- Closing feed and drain pipe inlets and light fitting openings
- Applying the waterproof layer across the floor, walls and pool rim
- Treating corners and pour joints with a suitable compound
- Inspecting the concrete and locating cracks and hairline cracks
The stages of the work in Al Jawahir
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Start from Al Jawahir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Al Jawahir is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing before tiling in Al Jawahir
Can a pool in Al Jawahir be lined without removing all the tiles?
It may be possible if the tiles are firmly bonded and sound, in which case surface preparation may suffice. Loose tiles are removed, and the photos will show which case applies to you.
Do the water inlets of a pool in Al Jawahir need special treatment?
Yes, they are among the points most prone to cracking, so they are treated carefully as part of the lining. Send clear photos of them so we can determine what they need.
Do you offer pool waterproofing before tiling in Al Jawahir?
Yes. Al Jawahir is within our service area in the Eastern Province, and we also work in An Nasirah, Az Zarah and Al Husain. Call us or send photos of the spot on WhatsApp.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
What decides the cost of waterproofing a pool before tiling?
The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
We also offer it in neighbouring areas
We also work near Al Jawahir, in An Nasirah, Az Zarah and Al Husain.
More services in Al Jawahir


