Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Al Husain

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Al Husain

Pool waterproofing before tiling in Al Husain starts with a photo of the basin, its corners and pipes, sent by call or WhatsApp. The district has villas and residential homes, and its pools vary by age, size and design.

Pool conditions in Al Husain vary by shell age and previous treatments. An older basin often shows cracks at corners and floor and leaks at pipe joints, while a newer shell may need only spot treatment for damp. Intense summer heat on the concrete surface and moisture around the foundation affect concrete integrity before tiling. Photos clarify the shell's condition to determine what treatments are needed.

  • Al Husain is a district in the Eastern Province, close to Al Bahari, Az Zarah and Al Qudayh, with villas and residential homes.
  • Pools in older homes often show dampness on walls and corners before new tiles are laid.
What the service includes

The scope of the work in Al Husain

  • Inspecting the concrete and locating cracks and hairline cracks
  • Applying the waterproof layer across the floor, walls and pool rim
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
How we work

This is how we work in Al Husain

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in Al HusainWe choose the method and the materials once we know the condition of the spot.

We serve Al Husain and around itIncluding Al Bahari, Az Zarah and Al Qudayh (near Qatif), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Al Husain

Can cracks in a pool shell in Al Husain be repaired without replacing it?

In most cases yes, if the cracks are surface-level or at corners and joints. Photos show the depth and cause of cracks, allowing us to treat them and then apply the waterproof layer before tiling.

What do you do about dampness on the pool floor and walls before waterproofing?

We clean and dry the surface, then address the source of dampness, whether it is a leak or moisture from around the pool. After that we apply the waterproof layer to ensure tiles adhere properly.

How do I request pool waterproofing before tiling in Al Husain?

Call us, or send clear photos of the spot and its location in Al Husain on WhatsApp, and we will work out the next step with you.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

Nearby areas

Areas near Al Husain

We also offer pool waterproofing before tiling in Al Bahari, Az Zarah and Al Qudayh (near Qatif), among the closest areas to Al Husain.

Other services in the area

More services in Al Husain

Mosaic-tiled seaside pool

Tell us about your site in Al Husain
and we will plan the next step with you

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp