
Pool waterproofing after tiling in Al Jawahir
We treat leaking tiled pools in Al Jawahir by first finding the point of leakage, then sealing the joints, cracks and fittings. Send photos of the pool by call or WhatsApp.
Al Jawahir is a residential district of houses and villas with yards of varying size, and its pools are often open to the sun all day. Heat makes tiles expand and contract, so joints can give way and cracks tend to form at edges and corners. The photos show whether the fault lies in the tiles or in the layer beneath before a treatment is chosen.
- Al Jawahir is a residential district in the Eastern Province of houses and villas, near An Nasirah and Az Zarah.
- Tiles expanding and contracting with heat weaken joints over time, so leaks appear at the edges.
The main items of pool waterproofing after tiling in Al Jawahir
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Watching the water level after filling to confirm the leak is closed
- Closing pump, light and return fittings from inside
- Injecting cracks with a compound suited to the concrete shell
How we carry out pool waterproofing after tiling in Al Jawahir
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.
Start from Al Jawahir with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from Al Jawahir comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about pool waterproofing after tiling in Al Jawahir
Why do cracks appear at the edges of pools in Al Jawahir specifically?
High heat makes tiles expand and contract, so edges and corners weaken first. The photos show whether this is the cause or whether there is another fault in the structure.
Do you serve all of Al Jawahir?
Yes, we serve Al Jawahir. Send photos of the pool and its place in the yard, and tell us where you think the leak is so we can start there.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?
In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.
How do I request pool waterproofing after tiling in Al Jawahir?
Call us, or send clear photos of the spot and its location in Al Jawahir on WhatsApp, and we will work out the next step with you.
We also offer it in neighbouring areas
Nearby areas we also cover: An Nasirah, Az Zarah and Al Husain.
More services in Al Jawahir


