Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in An Nasirah

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in An Nasirah

We waterproof tiled pools in An Nasirah once the source of the leak is traced, treating the joints, cracks and fittings where needed. Send photos of the pool by call or WhatsApp.

An Nasirah is a residential district close to the sea, where humidity keeps walls around a pool damp for longer. Trouble usually shows at joints near outer walls and at drain entries, so the photos start with those spots. They reveal whether the damp comes from the pool or from the wall around it before a method is chosen.

  • An Nasirah is a residential district in the Eastern Province close to the sea, with Al Jawahir and Al Husain among the nearby places.
  • Sea-side humidity keeps walls wet, making a leak from the pool hard to tell apart from surrounding damp.
What the service includes

The scope of the work in An Nasirah

  • Resealing joints with a flexible water-resistant compound
  • Testing the leak area with dye and pressure-checking the lines
  • Watching the water level after filling to confirm the leak is closed
  • Closing pump, light and return fittings from inside
How we work

This is how we work in An Nasirah

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

An Nasirah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from An Nasirah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing after tiling in An Nasirah

How can I tell wall damp from a pool leak in An Nasirah?

Sea-side damp often looks much like a leak, so the photos are used to trace the joints and the path of the wetness. If that is not clear enough we will say so rather than assume.

Can a pool close to outer walls in An Nasirah be treated?

Yes, we serve An Nasirah. Send photos of the pool and the wall nearby, and we will say whether treatment is limited to the joints or extends to the surrounding layer.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

Is An Nasirah within your service area?

Yes, An Nasirah is one of the areas we work in, as are Al Bahr (near Qatif), Al Jawahir and Al Husain. To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

If the site is outside An Nasirah, the same service is available in Al Bahr (near Qatif), Al Jawahir and Al Husain.

Other services in the area

More services in An Nasirah

Pool at night with water jets after waterproofing

In An Nasirah and need pool waterproofing after tiling?
Send us photos of the spot

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp