Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in An Nawras

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in An Nawras

Pool waterproofing after tiling in An Nawras starts with photos of the pool and the leak, sent by call or WhatsApp. We pinpoint the source and then seal the joints, cracks and fittings with the right treatment.

An Nawras lies near the coastal zone, with a mix of houses, residential compounds and public amenities. Pools there are exposed to damp air and salt from the nearby Gulf, hastening grout and joint decay. Tiled pools may leak at corners, floors and openings due to seasonal expansion and contraction. Clear photos of the leak site and surrounding damp help us choose the best treatment approach.

  • An Nawras is a district in the Eastern Province, near Al Fanar, King Faisal University and King Abdul Aziz Seaport, with diverse housing and facilities.
  • Coastal humidity weakens the bond of grout and seals faster than inland areas, so pools need regular maintenance.
What the service includes

What we do for you in An Nawras

  • Watching the water level after filling to confirm the leak is closed
  • Injecting cracks with a compound suited to the concrete shell
  • Resealing joints with a flexible water-resistant compound
  • Closing pump, light and return fittings from inside
How we work

The steps of pool waterproofing after tiling in An Nawras

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

Your request from An Nawras comes to usCall or WhatsApp on one number, and we answer you ourselves.

An Nawras is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing after tiling in An Nawras

Is a leak in a coastal pool harder to fix than an inland one?

The challenge may be greater because damp and salt affect materials. But the method remains the same: we identify the source from photos and then choose treatment suitable for the marine environment.

Does An Nawras's closeness to the Gulf affect the treatment?

Yes, we choose sealing materials that withstand high damp and salt. Photos tell us about the pool's condition and surrounding moisture, so we adjust the method accordingly.

What decides the cost of waterproofing a pool after tiling?

The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?

In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.

How do I request pool waterproofing after tiling in An Nawras?

Call us, or send clear photos of the spot and its location in An Nawras on WhatsApp, and we will work out the next step with you.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Fanar, King Faisal University and King Abdul Aziz Seaport.

Other services in the area

More services in An Nawras

Pool at night with water jets after waterproofing

Your first step in An Nawras:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp