Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in An Nawras

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in An Nawras

Pool waterproofing before tiling in An Nawras starts with photos of the shell, corners and joints sent by call or WhatsApp. The district has diverse villas and residential blocks, with private and public pools of varying sizes and depths. Treating the concrete base before tiling protects against dampness and leaks for years.

Pools in An Nawras vary widely: small ones in villas and larger ones in compounds and clubs. The concrete shell needs treatment for the hairline cracks that show in corners and joints between panels, and around pipe entries and drains. The nearby coastal humidity can stress the concrete, especially if the hole sits close to the groundwater level. Photos clarify the concrete surface condition so the right treatment method can be chosen before tile adhesive goes down.

  • An Nawras is a district in the Eastern Province, close to Al Fanar and King Abdul Aziz Seaport, with villas and residential blocks.
  • A pipe entry in the pool floor or walls is a common weak point that needs careful treatment before tiling.
What the service includes

What the service covers in An Nawras

  • Closing feed and drain pipe inlets and light fitting openings
  • Inspecting the concrete and locating cracks and hairline cracks
  • Checking the layer is complete before tiling is allowed to begin
  • Cleaning the surface and removing casting residue and dust
How we work

The stages of the work in An Nawras

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in An NawrasWe choose the method and the materials once we know the condition of the spot.

Your request from An Nawras comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in An Nawras

Are cracks in the pool concrete treated before tiling?

Yes, hairline cracks in corners and joints must be treated first to prevent water seeping later. Send us photos of the pool so we can assess the cracks and choose the right treatment.

When should a pool in An Nawras be waterproofed before it is tiled?

Right after digging and pouring is done and before tiling begins. This ensures the concrete surface is properly treated and joints are sealed so water does not leak through them later.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you cover An Nawras?

Yes. We serve An Nawras and nearby areas such as Al Fanar, King Faisal University and King Abdul Aziz Seaport, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Fanar, King Faisal University and King Abdul Aziz Seaport.

Other services in the area

More services in An Nawras

Mosaic-tiled seaside pool

In An Nawras and need pool waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp