Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in King Abdul Aziz Seaport

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in King Abdul Aziz Seaport

We treat leaks in pools tiled after construction in King Abdul Aziz Seaport by first finding the source, then treating the joints, cracks and fittings. The area lies near Ad Dabab, An Nawras and Al Fanar, and you can send pool photos by call or WhatsApp.

The area near the port has newer residential buildings alongside older homes, and its pools are exposed to coastal humidity and salt spray. Leaks and damp usually appear at the edges and joints over time, and the origin can sometimes be the waterproofing layer under the tiles. The photos show where the damp comes from before the treatment method is chosen.

  • King Abdul Aziz Seaport is a residential area in Al-Ahsa in the Eastern Province, close to Ad Dabab, An Nawras and Al Fanar.
  • Pools near the coast face humid, salty air, which calls for closer attention to edges and metal fittings.
What the service includes

What we do for you in King Abdul Aziz Seaport

  • Testing the leak area with dye and pressure-checking the lines
  • Resealing joints with a flexible water-resistant compound
  • Injecting cracks with a compound suited to the concrete shell
  • Watching the water level after filling to confirm the leak is closed
How we work

How we carry out pool waterproofing after tiling in King Abdul Aziz Seaport

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Concrete and reinforcement protectedClosing the leak early stops water reaching the reinforcement before corrosion begins.

We serve King Abdul Aziz Seaport and around itIncluding Ad Dabab (near Dammam), An Nawras and Al Fanar, as part of our work across the Eastern Province.

King Abdul Aziz Seaport is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in King Abdul Aziz Seaport

Does salty air affect pools near the port after tiling?

It can affect edges, metal fittings and joints over time. These spots are examined in the photos, and the treatment suited to each is set out clearly.

Are phone photos enough to diagnose a leak near the port?

Usually clear photos of the edge and the damp, with a note on where the water level falls, are enough as a first step. If they are not enough to locate the source, we will ask you for what is needed.

Do you offer pool waterproofing after tiling in King Abdul Aziz Seaport?

Yes. King Abdul Aziz Seaport is within our service area in the Eastern Province, and we also work in Ad Dabab (near Dammam), An Nawras and Al Fanar. Call us or send photos of the spot on WhatsApp.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

What is the difference between resealing joints and injecting cracks in a pool?

A joint is the line between two tiles or between a tile and a fitting, and it is resealed with a flexible water-resistant compound that tolerates shell movement. A crack is a break in the concrete or render behind the tile, and it is injected with a compound that fills the void and stops it spreading. The source determines which treatment is used.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

Nearby areas

Areas near King Abdul Aziz Seaport

If the site is outside King Abdul Aziz Seaport, the same service is available in Ad Dabab (near Dammam), An Nawras and Al Fanar.

Other services in the area

More services in King Abdul Aziz Seaport

Pool at night with water jets after waterproofing

Pool waterproofing after tiling in King Abdul Aziz Seaport?
Call us now

Call us or send photos of the pool and any suspect areas on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp