
Cementitious pool waterproofing in Gharb An Nabiyah
Cementitious pool waterproofing in Gharb An Nabiyah starts with photos of the basin, walls and floor, sent by call or WhatsApp. The area has homes and villas, both new and older, each pool with its own material and age.
Gharb An Nabiyah has scattered homes, with villas holding newer pools and older ones whose floors may be cracked. An exposed pool heats up in summer, so its surface expands and contracts, and the applied layer needs enough flexibility. Older pools often show cracks at corners and joints, while newer ones may need only a surface renewal. The photos show what is needed before a method is chosen.
- Gharb An Nabiyah is a district in Dammam in the Eastern Province, close to An Nabiyah, Ar Rimal and Al Jish.
- Exposed pool basins face temperature swings, so the flexible layer must cope with the movement they cause.
The main items of cementitious pool waterproofing in Gharb An Nabiyah
- Checking the pool walls and floor and locating cracks and openings
- Cleaning the concrete surface and removing any adhesive residue or dust
- Treating hairline cracks and the wall-to-floor junction
- Closing return pipe openings and drain outlets before the coating goes on
How we carry out cementitious pool waterproofing in Gharb An Nabiyah
Send photos of the pool
On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.
Prepare the concrete surface
The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.
Apply the cementitious coating
The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.
Wet curing and drying
The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.
Why Abraj Al Azl?
Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.
Your request from Gharb An Nabiyah comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Gharb An Nabiyah and around itIncluding An Nabiyah, Ar Rimal and Al Jish (near Mallahah), as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on cementitious pool waterproofing in Gharb An Nabiyah
Can floor cracks be repaired before coating in Gharb An Nabiyah?
Yes, cracks are repaired and sealed before the flexible layer goes on. Reviewing the photos shows the extent and type of repair needed.
Do you serve newer pools in Gharb An Nabiyah?
Yes, we serve Gharb An Nabiyah, both newer and older pools. Send pool photos so we can establish what is actually needed.
Do you offer cementitious pool waterproofing in Gharb An Nabiyah?
Yes. Gharb An Nabiyah is within our service area in the Eastern Province, and we also work in An Nabiyah, Ar Rimal and Al Jish (near Mallahah). Call us or send photos of the spot on WhatsApp.
Does cementitious waterproofing work for both in-ground and above-ground pools?
Yes. The cementitious layer goes onto concrete regardless of where the pool sits. The difference is the soil and groundwater pressure on a buried shell, which affects how cracks and joints are treated. Photos and the site details help us work out what is needed.
How do I know if the concrete is ready for the cementitious coating?
The surface should be clean and free of oils, dust and old adhesive residue, and any large cracks should have been treated first. You do not need to judge this yourself: send photos of the concrete on WhatsApp and we will tell you whether it needs more preparation before we start.
Must the old tiles be removed before the cementitious layer is applied?
Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.
We also offer it in neighbouring areas
We also work near Gharb An Nabiyah, in An Nabiyah, Ar Rimal and Al Jish (near Mallahah).
More services in Gharb An Nabiyah

