Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Gharb An Nabiyah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Gharb An Nabiyah

Bathroom waterproofing before tiling in West An Nabiyah begins with photos of the bathroom, sent by call or WhatsApp. The floor and water-exposed walls are covered with a continuous membrane before adhesive and tiles are laid.

West An Nabiyah has scattered houses, villas and small buildings, and its bathrooms range from recent builds to ones altered years ago. The bathroom often sits over a cast-in-place slab, and dampness usually appears where the floor meets the wall and around drain outlets. The method depends on each bathroom's condition, so the photos decide what is needed before any work.

  • West An Nabiyah is a residential area in Dammam in the Eastern Province, near An Nabiyah, Ar Rimal and Al Jish.
  • Altered bathrooms can contain old joints that do not bond to new layers, so they need checking first.
What the service includes

What the service covers in Gharb An Nabiyah

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
How we work

From first contact to the finished job in Gharb An Nabiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Bathroom waterproofing before tiling in Gharb An NabiyahWe choose the method and the materials once we know the condition of the spot.

Gharb An Nabiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Gharb An Nabiyah

Does waterproofing suit altered bathrooms in West An Nabiyah?

Often yes, once old joints and the existing floor are checked. Damaged spots are treated first and then the membrane goes on; the photos will show whether more is needed.

What decides the waterproofing method in West An Nabiyah homes?

The floor and wall condition, the chosen tile type and the drain positions decide it. Send photos so we can tell whether spot treatment is enough or full coverage is needed.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you cover Gharb An Nabiyah?

Yes. We serve Gharb An Nabiyah and nearby areas such as An Nabiyah, Ar Rimal and Al Jish (near Mallahah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

We also offer it in neighbouring areas

We also work near Gharb An Nabiyah, in An Nabiyah, Ar Rimal and Al Jish (near Mallahah).

Other services in the area

More services in Gharb An Nabiyah

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Gharb An Nabiyah:
a call or a WhatsApp message

Describe the problem and where it is in Gharb An Nabiyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp