Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Gharb An Nabiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Gharb An Nabiyah

We offer bitumen bathroom waterproofing in West An Nabiyah after reviewing photos of the floor and wall bases sent by call or WhatsApp. The area has houses and residential buildings with multiple bathrooms, and bitumen goes on before the screed and tiling.

West An Nabiyah is a area of houses and mid-sized residential buildings, and its bathrooms usually sit on concrete floors with tiling above. Damp typically shows at the corner where floor meets wall and around the bathroom drain after years of use. Bitumen goes onto these points before the screed, and the application varies with the base the photos reveal.

  • West An Nabiyah is a residential area in the Eastern Province, lying near An Nabiyah, Ar Rimal and Al Jish.
  • The corner between floor and wall is among the most common places for damp to collect in older bathrooms.
What the service includes

What we do for you in Gharb An Nabiyah

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The steps of bitumen bathroom waterproofing in Gharb An Nabiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Gharb An Nabiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Gharb An Nabiyah and around itIncluding An Nabiyah, Ar Rimal and Al Jish (near Mallahah), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Gharb An Nabiyah

Can bathroom floors in West An Nabiyah be waterproofed before new tiles go down?

Yes, bitumen is applied before the screed, which is the right moment before new tiles are fixed. If the old tiles remain, the photos will show whether they need removing.

What is the difference between waterproofing the floor and the wall base in a bathroom?

The floor is the whole horizontal surface, while the wall base is the strip where the wall meets it. Bathrooms often need treatment at both, and the photos show which parts are needed.

Do you cover Gharb An Nabiyah?

Yes. We serve Gharb An Nabiyah and nearby areas such as An Nabiyah, Ar Rimal and Al Jish (near Mallahah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

Areas near Gharb An Nabiyah

Nearby areas we also cover: An Nabiyah, Ar Rimal and Al Jish (near Mallahah).

Other services in the area

More services in Gharb An Nabiyah

Pool at night with water jets after waterproofing

We start with you in Gharb An Nabiyah
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp