
Bitumen bathroom waterproofing in Ar Rimal
We waterproof Ar Rimal bathrooms with bitumen by reviewing photos of the floor and wall bases you send by call or WhatsApp. The district has relatively modern flats and houses, and bitumen treats the floor before the screed and tiling.
Ar Rimal has apartment blocks and newer houses, and its bathrooms commonly carry tiling over concrete floors laid at speed. Problems usually surface where the floor meets the wall and around the drain, especially when water spreads from the bathroom into adjacent floors. Bitumen is applied to these points before the screed, and the type is chosen after the photos show the base.
- Ar Rimal is a residential district in Dammam in the Eastern Province, bordering Al Jish and Ar Rayah.
- When water migrates from a bathroom into a flat's corridors, the cause is usually a weak base seal rather than the tiles.
The scope of the work in Ar Rimal
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
- Closing the waterproofing around drain openings and pipe entries
- Checking the concrete floor and wall bases and identifying cracks
From first contact to the finished job in Ar Rimal
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Ar Rimal is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Ar Rimal and around itIncluding Al Jish (near Mallahah), Ar Rayah and Al Jish (near Ar Rayah), as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen bathroom waterproofing in Ar Rimal
Is bitumen suitable for flat bathrooms in Ar Rimal?
Usually yes, since it goes onto the floor and wall bases before the screed. In shared flats coordination with neighbours may be needed, which we explain once the photos are reviewed.
How is a leaking bathroom in Ar Rimal checked before waterproofing?
We start with photos of the damp, the joints and the drain, then narrow down where the leak likely starts. Photos cannot confirm every source, so further testing may be needed.
How do I request bitumen bathroom waterproofing in Ar Rimal?
Call us, or send clear photos of the spot and its location in Ar Rimal on WhatsApp, and we will work out the next step with you.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Bitumen bathroom waterproofing near Ar Rimal
If the site is outside Ar Rimal, the same service is available in Al Jish (near Mallahah), Ar Rayah and Al Jish (near Ar Rayah).
More services in Ar Rimal




