
Bitumen bathroom waterproofing in Ar Rayah
Bitumen bathroom waterproofing in Ar Rayah starts with WhatsApp messages containing photos of the floor and lower walls. The area has residential houses and villas, whose bathroom floors face foundation moisture and water rising from surrounding soil.
Houses in Ar Rayah vary in age and foundations, with some older bathrooms and others newer. Water may rise from soil beneath the foundation or seep from old pipes, both leaving the floor damp and tiles loose. Bitumen creates a water barrier on the floor before screed and tiles go down, resisting pressure from rising water. Photos of the bathroom and its surroundings tell us whether seepage is localised or widespread, and this determines how much bitumen is needed.
- Ar Rayah is a residential district in the Eastern Province near Al Jish, Al Iskan and Mallahah, containing houses and villas.
- A bathroom in a villa or house in a residential area may face moisture from below the foundation or from a break in indoor pipework.
The main items of bitumen bathroom waterproofing in Ar Rayah
- Cleaning the surface and treating cracks and corners before application
- Applying bitumen layers over the floor including the shower area
- Checking the concrete floor and wall bases and identifying cracks
- Turning the layer up the walls in the wet zone and sealing the corners
From first contact to the finished job in Ar Rayah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Ar Rayah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Start from Ar Rayah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Ar Rayah
Can a bathroom be waterproofed with bitumen without removing old tiles?
If the tiles are sound we may waterproof beneath them, but if loose or cracked they must come off first to treat the base and apply bitumen. Photos show the condition and we explain the steps.
How can we ensure bitumen stops water rising from the foundation?
Bitumen forms a solid water barrier that rising water cannot penetrate. If moisture is very severe we may also treat the lower walls. We will advise based on the photos and the extent of seepage.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
How do I request bitumen bathroom waterproofing in Ar Rayah?
Call us, or send clear photos of the spot and its location in Ar Rayah on WhatsApp, and we will work out the next step with you.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
We also offer it in neighbouring areas
If the site is outside Ar Rayah, the same service is available in Al Jish (near Ar Rayah), Al Iskan (near Mallahah) and Mallahah.
More services in Ar Rayah




