Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Iskan (near Mallahah)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Iskan (near Mallahah)

Bitumen bathroom waterproofing in Al Iskan begins with a photo of the floor and lower walls sent via WhatsApp or call. Al Iskan is a residential district with closely-built homes, and each bathroom needs a careful protective layer before screed and tiles are raised.

Al Iskan is a residential district with similarly-sized, close-aged homes, so bathrooms are less varied than in other areas, but the extreme humidity and heat of the Eastern Province stress any waterproofing. Bitumen forms a strong barrier against water seepage before finishing and must cover the floor, corners and joints. Surface condition and thickness determine the bitumen needed, and your photo makes that clear.

  • Al Iskan is a district in the Eastern Province near Al Badrani, Ar Rayah and Al Jish, with closely-built residential homes.
  • Bathrooms in closely-spaced residential homes need careful waterproofing because moisture can migrate to shared walls.
What the service includes

What the service covers in Al Iskan (near Mallahah)

  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

This is how we work in Al Iskan (near Mallahah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Al Iskan (near Mallahah)We choose the method and the materials once we know the condition of the spot.

Your request from Al Iskan (near Mallahah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Iskan (near Mallahah)

Is bitumen alone enough to waterproof a bathroom in Al Iskan or do we need another layer?

Bitumen provides strong protection when applied correctly to a clean surface. Screed and tiles then complete the protection. If you want an extra layer, photos will show whether it is necessary based on the surface condition.

How long does bathroom bitumen waterproofing take in Al Iskan?

Time depends on the bathroom size, surface condition and ventilation. After application, bitumen needs drying time before finishing, and we will advise you of the steps and timings when you call.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I request bitumen bathroom waterproofing in Al Iskan (near Mallahah)?

Call us, or send clear photos of the spot and its location in Al Iskan (near Mallahah) on WhatsApp, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Badrani, Ar Rayah and Al Jish (near Ar Rayah).

Other services in the area

More services in Al Iskan (near Mallahah)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Iskan (near Mallahah)?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp