Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Iskan (near Mallahah)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Iskan (near Mallahah)

Bathroom waterproofing before tiling in Al Iskan begins with photos of the wet area sent to us by call or WhatsApp. We apply a continuous waterproof membrane to protect the floor and walls from water seepage before tiles are laid. This safeguards the building structure and walls from moisture.

Al Iskan consists of uniform, closely-spaced residential buildings, each with several small to medium flats. Bathrooms in these flats are usually tight spaces with a shower, toilet and washbasin, and some share party walls. Waterproofing before tiling becomes critical here because a leak in one flat could affect the neighbour's. Photos show us the layout and connections, so we choose a method that protects both the bathroom and the flat.

  • Al Iskan is a district in the Eastern Province, close to Al Badrani, Ar Rayah and Al Jish, made up of closely-grouped residential buildings.
  • Adjacent small flats require precise bathroom waterproofing to prevent water leakage between units.
What the service includes

What the service covers in Al Iskan (near Mallahah)

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

How we carry out bathroom waterproofing before tiling in Al Iskan (near Mallahah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Al Iskan (near Mallahah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Iskan (near Mallahah) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Iskan (near Mallahah)

Does waterproofing a bathroom in one flat protect the adjacent flat from water leaks?

Good waterproofing of your walls and floor stops water entering the structure from your side. But if the party wall is old there may be existing issues. Photos will help us assess the situation and advise you on what is needed.

When should a bathroom be waterproofed in Al Iskan, before or after buying a flat?

It is best done before active use and tiling begins. If you buy a flat and find the bathroom unproofed, send photos and we will help with the necessary steps.

What should I send you from Al Iskan (near Mallahah)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Iskan (near Mallahah), and we will work out the next step with you.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Areas near Al Iskan (near Mallahah)

We also work near Al Iskan (near Mallahah), in Al Badrani, Ar Rayah and Al Jish (near Ar Rayah).

Other services in the area

More services in Al Iskan (near Mallahah)

Worker applying the white insulation layer on a villa roof by the sea

In Al Iskan (near Mallahah) and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp