Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Badrani

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Badrani

We provide bathroom waterproofing before tiling in Al Badrani, with a continuous membrane on the floor and wet-area walls before adhesive and tiles. We begin with photos sent by call or WhatsApp.

Al Badrani is a hamlet where older and newer houses sit side by side, and its bathrooms differ in age and finish. In older bathrooms cracks usually appear at corners and joints, letting moisture through beneath the tiles. Newer bathrooms need joints treated differently, so the photos decide the method before anything else.

  • Al Badrani is a hamlet in the Al-Ahsa governorate of the Eastern Province, close to Al Iskan, Al Badiah and Ar Rayah.
  • Cracked wall-to-floor joints are among the first things treated in any bathroom before tiling.
What the service includes

What we do for you in Al Badrani

  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
How we work

How we carry out bathroom waterproofing before tiling in Al Badrani

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Badrani comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Badrani with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Badrani

Can an older bathroom in Al Badrani be tiled directly over the waterproofing?

That depends on whether the floor is sound and suitable for lining, which the photos show. The membrane must fully cure before adhesive and tiles go on, to ensure bonding.

Which spots matter most in Al Badrani bathrooms?

The corners, the floor-to-wall joint and the areas around the basin and shower, since these take the most water. Send photos of them so we know where treatment should begin.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Is Al Badrani within your service area?

Yes, Al Badrani is one of the areas we work in, as are Al Iskan (near Mallahah), Al Badiah and Ar Rayah. To start, call us or message us on WhatsApp.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

Bathroom waterproofing before tiling near Al Badrani

If the site is outside Al Badrani, the same service is available in Al Iskan (near Mallahah), Al Badiah and Ar Rayah.

Other services in the area

More services in Al Badrani

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Badrani
with one call

Describe the problem and where it is in Al Badrani, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp