Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Rimal

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Rimal

In Ar Rimal, pre-tiling bathroom waterproofing starts with photos of the floor and the walls around the shower and basin, sent by call or WhatsApp. A continuous waterproof membrane is applied before adhesive and tiles go down.

Ar Rimal has newer apartment blocks and villas, and its bathrooms are usually tiled over raised or recently cast concrete floors. The wall beside the shower takes the most water, and the damage shows as staining and loose tiles in the corners. Openings around the basin and toilet also need careful sealing because they are likely leak points. The photos show which of these spots need attention.

  • Ar Rimal is a residential district in Dammam in the Eastern Province, close to Al Jish and Ar Rayah.
  • The basin and toilet need their openings sealed, as they are among the most common leak points after the shower.
What the service includes

What we do for you in Ar Rimal

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The steps of bathroom waterproofing before tiling in Ar Rimal

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Ar Rimal and around itIncluding Al Jish (near Mallahah), Ar Rayah and Al Jish (near Ar Rayah), as part of our work across the Eastern Province.

Ar Rimal is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Ar Rimal

Can waterproofing be applied to new bathrooms in Ar Rimal just before tiling?

Yes, this is the ideal time. The membrane goes on the floor and wet-area walls before adhesive, and is left to dry before tiling starts.

Are the wall corners around the shower treated in Ar Rimal homes?

Yes, the corners and joints around the shower are treated, since they take the most water. Send a clear photo of them so we can agree what is needed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Is Ar Rimal within your service area?

Yes, Ar Rimal is one of the areas we work in, as are Al Jish (near Mallahah), Ar Rayah and Al Jish (near Ar Rayah). To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in Al Jish (near Mallahah), Ar Rayah and Al Jish (near Ar Rayah), among the closest areas to Ar Rimal.

Other services in the area

More services in Ar Rimal

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Ar Rimal
with one call

Describe the problem and where it is in Ar Rimal, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp