Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Third Industrial Area

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Third Industrial Area

Cementitious pool waterproofing in the Third Industrial Area starts with photos of the basin, walls and floor, sent by call or WhatsApp. The area holds facilities and buildings whose pools see heavier, repeated use, and the flexible cement coating is chosen from what the photos show.

Basins in industrial facilities and service complexes are usually built in large-volume concrete, and their floors and walls take continuous movement from users and equipment. Over time joints can widen and edges crack, and the bedding that holds the tiles can weaken. The treatment considers the basin's length, depth and points of stress before the right coating is chosen.

  • The Third Industrial Area is an industrial district in the Eastern Province, next to the Second Industrial Area.
  • Heavily used basins stay exposed to concrete movement, so a flexible coating is chosen to absorb it.
What the service includes

The main items of cementitious pool waterproofing in Third Industrial Area

  • Treating hairline cracks and the wall-to-floor junction
  • Wet curing after application so the coating sets correctly
  • Closing return pipe openings and drain outlets before the coating goes on
  • Cleaning the concrete surface and removing any adhesive residue or dust
How we work

The steps of cementitious pool waterproofing in Third Industrial Area

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Flexibility that handles shell movementThe flexible additives in the cement mix let the coating absorb slight movement from heat and water pressure without cracking and opening a path for water.

Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Third Industrial Area with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about cementitious pool waterproofing in Third Industrial Area

Is cementitious coating suitable for a large basin in the Third Industrial Area?

Often yes, when the concrete is sound and the walls need a continuous seal. The photos determine the scope of work and the right coating before any decision is made.

How do I start a pool waterproofing request in the Third Industrial Area?

Send photos of the basin from several angles, with a brief note on where it sits and how it is used, by call or WhatsApp, and we will reply with the next step.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

How do I request cementitious pool waterproofing in Third Industrial Area?

Call us, or send clear photos of the spot and its location in Third Industrial Area on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near Third Industrial Area

We also offer cementitious pool waterproofing in Second Industrial Area, Al Fasl and Industrial Area, among the closest areas to Third Industrial Area.

Other services in the area

More services in Third Industrial Area

Empty seaside pool during waterproofing

We start with you in Third Industrial Area
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp