Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Third Industrial Area

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Third Industrial Area

Pool waterproofing before tiling in the Third Industrial Area starts with photos of the basin and its pipe inlets, sent by call or WhatsApp. The area holds commercial buildings, warehouses and facilities with large concrete basins, and the work there differs from a domestic pool.

The Third Industrial Area is made up of commercial and industrial buildings, and pools there can be larger and built for heavier use. The corners and wall-to-floor joints need particular attention before tile adhesive goes on. Photos show the condition of the base concrete, and the lining method is chosen from that.

  • The Third Industrial Area is an industrial district in the Eastern Province, lying next to the Second Industrial Area.
  • Larger basins move and expand more, so their joints need a flexible lining that can take the movement.
What the service includes

What the service covers in Third Industrial Area

  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
  • Cleaning the surface and removing casting residue and dust
  • Inspecting the concrete and locating cracks and hairline cracks
How we work

How we carry out pool waterproofing before tiling in Third Industrial Area

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Pool waterproofing before tiling in Third Industrial AreaWe choose the method and the materials once we know the condition of the spot.

Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in Third Industrial Area

Do you waterproof pool basins at industrial facilities?

Yes, we serve the Third Industrial Area. Send photos of the basin and tell us its size and the facility it belongs to, so we can judge together whether pre-tiling waterproofing suits the job.

How are pipe inlets treated in a large basin?

Pipe inlets are cleaned and the gaps around them sealed before the lining goes on; this depends on the type and condition of the pipes, which the photos will show.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What should I send you from Third Industrial Area?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Third Industrial Area, and we will work out the next step with you.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Nearby areas

Areas near Third Industrial Area

We also offer pool waterproofing before tiling in Second Industrial Area, Al Fasl and Industrial Area, among the closest areas to Third Industrial Area.

Other services in the area

More services in Third Industrial Area

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Third Industrial Area?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp