Abraj Al AzlContracting
Call العربية
Worker brushing a cementitious coat on a bare pool shell before tiling

Cementitious pool waterproofing in Second Industrial Area

The layer the tiles sit on

A flexible cement-based coating on the pool walls and floor, sealing the concrete and holding the tiles together

+966 54 311 2066
The service in your area

Cementitious pool waterproofing in Second Industrial Area

We provide cementitious pool waterproofing in the Second Industrial Area, applying a flexible cement-based coating to the walls and floor. The process begins with pool photos sent by call or WhatsApp. The area lies near the First and Third Industrial Areas, and its pools generally belong to facilities and housing around the plants.

The Second Industrial Area contains operational buildings and housing for workers, and its pools vary in size, age and use. Pools at facilities see heavy use, which increases tile lifting and leaks at joints. Some cases need concrete repair before coating, which the photos reveal before any method is chosen.

  • The Second Industrial Area is in Dammam in the Eastern Province, adjoining the First and Third Industrial Areas.
  • Heavily used pools need their joints and pipe entries checked regularly.
What the service includes

The cementitious pool waterproofing work in Second Industrial Area

  • Cleaning the concrete surface and removing any adhesive residue or dust
  • Treating hairline cracks and the wall-to-floor junction
  • Closing return pipe openings and drain outlets before the coating goes on
  • Checking the pool walls and floor and locating cracks and openings
How we work

The steps of cementitious pool waterproofing in Second Industrial Area

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, any cracks, the pipe openings and the drains, so we can read the concrete and decide the right treatment.

2

Prepare the concrete surface

The surface is cleaned of dust, oils and any adhesive residue, then hairline cracks, wall-to-floor junctions and pipe openings are treated before any layer goes on.

3

Apply the cementitious coating

The flexible cementitious coating is applied over the whole shell, walls and floor, turning up at corners and edges, and tightened around every pipe opening and drain, depending on the surface.

4

Wet curing and drying

The layer is kept moist after application so it cures correctly, then left to dry before tile adhesive goes on, because drying too fast weakens its bond to the concrete.

What sets us apart

Why Abraj Al Azl?

Bonds to concrete and to the tilesThe cementitious layer accepts a bond from both sides: concrete below and tile adhesive above, so the coating does not delaminate and the tiles do not loosen over time.

Second Industrial Area is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Second Industrial Area and around itIncluding First Industrial Area, Third Industrial Area and Industrial Area, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Indoor mosaic-tiled pool
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Second Industrial Area

Do you waterproof facility pools in the Second Industrial Area?

Yes, we serve the area. Send photos of the pool and tell us how it is used, which helps determine the suitable coating for its condition.

Can cementitious coating handle heavy use?

It can handle considerable use when the concrete beneath is sound and well prepared. Its suitability for your case is confirmed after the photos are reviewed.

What decides the cost of cementitious pool waterproofing?

The area of the pool walls and floor, the condition of the concrete, the number of cracks and pipe openings that need treating, and how easily the pool can be reached. Send photos and rough dimensions on WhatsApp and we will work out the treatment and the cost.

Must the old tiles be removed before the cementitious layer is applied?

Yes. The cementitious layer needs clean bare concrete to bond to. If old tiles are in place they are lifted first and the concrete is cleaned before the coating goes on. A new pool shell that has not been tiled is ready to treat directly.

Do you offer cementitious pool waterproofing in Second Industrial Area?

Yes. Second Industrial Area is within our service area in the Eastern Province, and we also work in First Industrial Area, Third Industrial Area and Industrial Area. Call us or send photos of the spot on WhatsApp.

Why is the cementitious coating kept moist after it is applied?

Cement sets through a chemical reaction that needs water. If the surface dries too fast because of heat or sun, the reaction weakens and hairline cracks open in the coating itself. Keeping it moist gives the layer time to cure properly before it is left to dry and receive the tiles.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Second Industrial Area, the same service is available in First Industrial Area, Third Industrial Area and Industrial Area.

Other services in the area

More services in Second Industrial Area

Empty seaside pool during waterproofing

Your first step in Second Industrial Area:
a call or a WhatsApp message

Describe the problem and where it is in Second Industrial Area, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp