Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Warehouse Area

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Warehouse Area

Foundation waterproofing in the Warehouse Area starts with photos of the base and below-ground walls, sent by call or WhatsApp. The district has warehouses, storage buildings and light industrial structures with deep foundations, where soil moisture and lateral pressure demand reliable waterproofing.

Warehouses and structures in the district have large buildings with deep foundations or low-level floors. The concrete base faces constant pressure from soil moisture and surrounding earth, and dampness may appear on the interior walls or around pipe entries. The choice of method depends on how deep the foundation is, what pressure is present, and what damage exists. Photos show the condition of the concrete, joints and cracks before bitumen or membranes are applied.

  • The Warehouse Area is a district in the Eastern Province, close to Al Majidiyah, Al Aqiq and Ash Shweikah, with warehouses and light industrial structures.
  • A deep foundation in an industrial building bears constant pressure from soil moisture and earth, so waterproofing must be continuous and free of gaps.
What the service includes

The foundation waterproofing work in Warehouse Area

  • Cleaning the surface and removing loose material and oil
  • Fixing protection boards over the waterproof layer before backfill
  • Treating cracks, pipe openings and joints before waterproofing
  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
How we work

This is how we work in Warehouse Area

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

The structure kept from moisture and saltsConstant moisture attacks the reinforcement and weakens the concrete over time, and the waterproof layer cuts that off from the start.

Your request from Warehouse Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

Foundation waterproofing in Warehouse AreaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about foundation waterproofing in Warehouse Area

Can a warehouse foundation be waterproofed without stopping operations?

It depends on where the foundation is, how severe the damage is, and what work is needed. Send photos of the walls and base, and we will discuss options and timing with you.

What do you do about dampness showing on the inside of foundation walls?

We address the cause by waterproofing the wall from outside with bitumen or membranes to block soil moisture, and may add interior protection depending on the case. Photos show how much the concrete is affected and where pipes and entries are.

What is the difference between waterproofing foundations in a new build and in an existing building?

In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.

Is Warehouse Area within your service area?

Yes, Warehouse Area is one of the areas we work in, as are Al Majidiyah, Al Aqiq (near Inak) and Ash Shweikah. To start, call us or message us on WhatsApp.

Is the waterproof layer affected by salty soil?

Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.

What materials are used in foundation waterproofing?

Common materials include torch-on or self-adhesive bitumen rolls, cold bitumen coating, and composite membranes, together with protection boards that shield the layer from soil pressure and backfill. The material choice depends on the wall, the soil conditions and the depth of the foundation.

Nearby areas

Areas near Warehouse Area

We also work near Warehouse Area, in Al Majidiyah, Al Aqiq (near Inak) and Ash Shweikah.

Other services in the area

More services in Warehouse Area

Two workers on the roof insulating around an AC unit

Your first step in Warehouse Area:
a call or a WhatsApp message

Call us or send photos of the walls and the foundation on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp