
Foundation waterproofing in Al Majidiyah
Foundation waterproofing in Al Majidiyah begins with photos of the affected area, sent by call or WhatsApp. The district has warehouses, workshops and residential buildings, where foundations face rising damp and underground walls need protection from water seepage.
Al Majidiyah combines commercial and residential activity; warehouses and industrial structures have large foundations exposed to damp, while apartment blocks need their lower walls and footings shielded from moisture. Coastal humidity adds a challenge, and the soil conducts water easily toward the foundation. The choice of waterproofing material depends on the foundation depth and soil saturation history, and photos show the concrete condition, any cracking and where water is entering.
- Al Majidiyah is a district in the Eastern Province, close to the Warehouse Area, Al Aqiq and Al Khamisah.
- Foundations in mixed commercial and residential districts face varied moisture pressure that requires careful assessment.
What the service covers in Al Majidiyah
- Cleaning the surface and removing loose material and oil
- Treating cracks, pipe openings and joints before waterproofing
- Checking the concrete walls and footing and locating cracks, joints and pipe openings
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
This is how we work in Al Majidiyah
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
Foundation waterproofing in Al MajidiyahWe choose the method and the materials once we know the condition of the spot.
Start from Al Majidiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book foundation waterproofing in Al Majidiyah
How do you know if a foundation in Al Majidiyah has water seeping in?
Signs include damp on lower walls, discolouration and odours. Send clear photos of the affected areas and tell us of any cracks or wet patches so we can assess the situation.
Does foundation waterproofing require excavation in Al Majidiyah?
It depends on where the seepage is and how deep the foundation goes. Photos and details about the building and surrounding soil help us decide whether digging is needed or if we can waterproof from inside.
How do I request foundation waterproofing in Al Majidiyah?
Call us, or send clear photos of the spot and its location in Al Majidiyah on WhatsApp, and we will work out the next step with you.
What materials are used in foundation waterproofing?
Common materials include torch-on or self-adhesive bitumen rolls, cold bitumen coating, and composite membranes, together with protection boards that shield the layer from soil pressure and backfill. The material choice depends on the wall, the soil conditions and the depth of the foundation.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
What decides the cost of foundation waterproofing?
The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.
The same service in nearby areas
If the site is outside Al Majidiyah, the same service is available in Warehouse Area, Al Aqiq (near Inak) and Al Khamisah.
More services in Al Majidiyah



