
Foundation waterproofing in Al Yasmin (near Al Khunn)
Foundation waterproofing in Al Yasmin starts with photos of the wall or footing concerned, sent by call or WhatsApp. Much of the district is villas, where additions meet older walls and a raised ground floor can leave a gap at the base. The photos show where the damp begins before we discuss any method.
Al Yasmin is largely villas on individual plots, and many have extensions built at different times beside the original walls. Where an extension meets an older wall, the joint and the change in foundation depth are common places for water to enter. A raised ground floor can also leave a narrow gap between the wall base and the paving, which holds water after rain. We study the joint lines and the paving edge in the photos before deciding whether the work is below ground or at the surface.
- Al Yasmin is a residential district in the Eastern Province, lying close to Yabrin, Al Muruj and Al Ekhaa.
- Where an extension meets an older wall, the joint is a common route for water to the foundation.
The main items of foundation waterproofing in Al Yasmin (near Al Khunn)
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Checking layer continuity at corners, edges and critical points
- Treating cracks, pipe openings and joints before waterproofing
- Fixing protection boards over the waterproof layer before backfill
This is how we work in Al Yasmin (near Al Khunn)
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
We serve Al Yasmin (near Al Khunn) and around itIncluding Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa, as part of our work across the Eastern Province.
Start from Al Yasmin (near Al Khunn) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Common questions on foundation waterproofing in Al Yasmin (near Al Khunn)
Does an extension always need its own foundation waterproofing?
Not always. The joint with the older wall is often the weak point, so we examine photos of that line first. If the new foundation itself is wet, the work is planned for that part only.
Can a raised ground floor be sealed from the outside?
Often the work is done from outside, because that is where water reaches the base. Send photos of the gap between the wall and the paving so we can see how the area is laid out.
Do you cover Al Yasmin (near Al Khunn)?
Yes. We serve Al Yasmin (near Al Khunn) and nearby areas such as Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
The same service in nearby areas
Nearby areas we also cover: Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa.
More services in Al Yasmin (near Al Khunn)



