
PVC membrane waterproofing in Al Yasmin (near Al Khunn)
PVC membrane waterproofing in Al Yasmin starts with photos of the roof or tank, sent by call or WhatsApp. Sheets are laid across wide roof areas with sealed edges and penetrations, and we serve Al Yasmin in the Eastern Province. The layout is worked out from the size and shape of the roof shown in the photos.
Al Yasmin is largely villas on wide plots, where many roofs are large, open and flat, with room for water tanks, plant and sometimes a covered sitting area. A wide membrane is joined from many sheets, so the seams and lap lines carry much of the work, and long edges along parapets need a precise finish. The sheet must also be carried neatly over the stair access and the covered area. The photos let us plan seam positions before any roll is opened.
- Al Yasmin is a residential district in the Eastern Province, close to Yabrin, Al Muruj and Al Ekhaa.
- A wide roof uses more sheets, so the seam positions are planned before any material is laid.
What we do for you in Al Yasmin (near Al Khunn)
- Adding a protection layer over the membrane on exposed roofs
- Laying PVC sheets and fixing them by the method that suits the site
- Sealing the layer at the parapet, AC bases and all penetrations
- Welding seams with hot air and checking them after cooling
This is how we work in Al Yasmin (near Al Khunn)
Send photos of the roof or tank
On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.
Prepare the surface
The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.
Lay the sheets and weld the seams
PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.
Check the seams and add the protection layer
Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.
Why Abraj Al Azl?
The seam disappears in the weldHeat welding fuses the two sheet edges into one layer, so no exposed edge remains for water to get through.
We serve Al Yasmin (near Al Khunn) and around itIncluding Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa, as part of our work across the Eastern Province.
PVC membrane waterproofing in Al Yasmin (near Al Khunn)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book PVC membrane waterproofing in Al Yasmin (near Al Khunn)
How do wide roofs affect the way sheets are joined?
A large roof needs more sheets, and every joint must be welded and checked. We set the seams so they avoid the lowest points and the main drainage routes. The photos help us see where those routes run across the roof.
Can a roof with a covered sitting area be membraned?
Yes, we serve Al Yasmin. Send photos of the covered area's supports, the roof behind it and the tanks, so we can see how the membrane meets the structure and the stair head.
What is the difference between PVC sheets and bitumen rolls for roof waterproofing?
Bitumen rolls are usually torch-applied and are stiffer, while PVC sheets are lighter, more flexible and their seams are welded with hot air rather than a flame. Each suits different situations; send photos of the roof so we can advise which fits.
How are PVC sheet seams welded and can they be checked?
Seams are welded with a hot-air welder that melts the surface of both sheets and presses them together so they fuse. Once cooled, the seams are checked by hand and with specialist tools to confirm no unjoined spot remains. This check is part of the work and happens before the protection layer goes on.
Do PVC sheets need a protection layer on top?
On roofs exposed to sun and foot traffic, a protection layer goes over the PVC, such as ballast, gravel or protection boards, to extend the membrane's life and shield it from mechanical wear and ultraviolet light. For tanks and pools the need is assessed by use.
Do you offer PVC membrane waterproofing in Al Yasmin (near Al Khunn)?
Yes. Al Yasmin (near Al Khunn) is within our service area in the Eastern Province, and we also work in Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa. Call us or send photos of the spot on WhatsApp.
The same service in nearby areas
Nearby areas we also cover: Yabrin (near Al Khunn), Al Muruj (near Al Khunn) and Al Ekhaa.
More services in Al Yasmin (near Al Khunn)



