Abraj Al AzlContracting
Call العربية
Excavated villa foundation wall coated with black bitumen and a protection board

Foundation waterproofing in Al Jisr

Sealed before backfill

Waterproofing for foundations and below-ground walls with bitumen and membranes

+966 54 311 2066
The service in your area

Foundation waterproofing in Al Jisr

Foundation waterproofing in Al Jisr, Hofuf, begins with photos of the outer walls of the footings, sent by call or WhatsApp. The district holds houses and villas close to Ishbiliya, Al Hamra and Al Khuzama, where below-ground walls are usually exposed to moisture from the surrounding soil.

Al Jisr is mostly made up of houses and villas, some older and some newer, whose foundations sit directly against the ground. When the outer faces of a footing get wet, damp patches usually appear near the floor line, and the protective layer needs careful work at corners and column joins. The photos show whether a surface treatment is enough or deeper work is needed.

  • Al Jisr is a district of Hofuf in Al Ahsa, lying close to Ishbiliya, Al Hamra and Al Khuzama.
  • A wall buried in soil is wetted from its outer face continuously, so the below-ground section is checked first.
What the service includes

What the service covers in Al Jisr

  • Checking the concrete walls and footing and locating cracks, joints and pipe openings
  • Treating cracks, pipe openings and joints before waterproofing
  • Fixing protection boards over the waterproof layer before backfill
  • Cleaning the surface and removing loose material and oil
How we work

From first contact to the finished job in Al Jisr

1

Send site photos

On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.

2

Prepare the surface

The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.

3

Apply the waterproof layer

Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.

4

Protection boards then backfill

Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.

What sets us apart

Why Abraj Al Azl?

No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.

Your request from Al Jisr comes to usCall or WhatsApp on one number, and we answer you ourselves.

Foundation waterproofing in Al JisrWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about foundation waterproofing in Al Jisr

Can the foundations of an existing house in Al Jisr be waterproofed?

In most cases yes, but it depends on whether the outer face of the footing can be reached. Send photos and we will explain what is possible before any work.

How does foundation damp show inside villas in Al Jisr?

Usually as stains at the base of interior walls or peeling paint near the floor. If you see these signs, send photos of the wall from inside and outside together.

What is the difference between waterproofing foundations in a new build and in an existing building?

In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.

What decides the cost of foundation waterproofing?

The area of wall to be treated, the depth of the foundation, the condition of the concrete and the number of cracks, whether excavation is needed to reach the wall, and the material that suits the site. Send photos and rough dimensions on WhatsApp so we can work out the treatment and the cost.

What do the protection boards do over the waterproof layer?

Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.

Do you cover Al Jisr?

Yes. We serve Al Jisr and nearby areas such as Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Al Jisr

If the site is outside Al Jisr, the same service is available in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar).

Other services in the area

More services in Al Jisr

Two workers on the roof insulating around an AC unit

We start with you in Al Jisr
with one call

Describe the problem and where it is in Al Jisr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp