Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Al Jisr

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Al Jisr

Cold bitumen waterproofing in Al Jisr begins with a photo of the roof, foundation or basin, sent by call or WhatsApp. The district has villas and houses of varying size, and roofs and small areas are coated by brush or roller as the photos indicate.

Houses in Al Jisr range from older homes to newer ones, and their roofs vary in size and levelness. Flat roofs often need cold bitumen at corners and drain outlets, while small basins and balconies are treated by brush. Which area gets coated depends on the current condition shown in the photos.

  • Al Jisr is a district in Al Khobar in the Eastern Province, close to Al Hamra and Al Khuzama.
  • Corners and drain outlets are usually the first spots on a flat roof to need recoating.
What the service includes

What the service covers in Al Jisr

  • Closing the waterproofing at the parapet, drain openings and AC bases
  • Adding the protective layer on sun-exposed surfaces once dry
  • Cleaning the surface and removing loose material and grease
  • Checking the surface and locating cracks and weak points
How we work

From first contact to the finished job in Al Jisr

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

No flame in confined spacesBrush and roller application makes the coating suitable for bathrooms, planters and any space where a flame is not safe.

We serve Al Jisr and around itIncluding Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar), as part of our work across the Eastern Province.

Al Jisr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cold bitumen waterproofing in Al Jisr

Is cold bitumen suitable for villa roofs in Al Jisr?

Often yes for flat roofs with simple, low-movement sections, and the photos will show whether it suits your particular roof.

Do you brush-coat small basins in Al Jisr?

Yes, small basins and compact areas are brush-coated. Send a photo of the spot and we will agree the right method with you.

Is cold bitumen suitable for outdoor planters and planting beds?

Yes. Cold bitumen is used on the inside walls of planters and planting beds to stop irrigation water reaching the adjacent walls or the surface below. It is applied to the concrete or tiles after cleaning, left to dry before the planter is filled with soil. Good ventilation of the space during application is important.

Is Al Jisr within your service area?

Yes, Al Jisr is one of the areas we work in, as are Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar). To start, call us or message us on WhatsApp.

Can cold bitumen be applied to freshly poured concrete?

It is not applied immediately after pouring. The concrete must complete its cure and dry fully first. Internally damp concrete prevents the coating from bonding and traps moisture beneath it, reducing how well the layer works. Send a photo and tell us when the concrete was poured and we will advise the right time to apply.

What is the difference between cold bitumen and bitumen rolls?

Bitumen rolls are a continuous sheet bonded by heat or adhesive, suited to large open surfaces. Cold bitumen is a liquid applied by brush or roller that reaches tight corners, confined areas and surfaces where rolls do not fit. The right choice depends on the location and the surface condition, and photos help us decide.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar).

Other services in the area

More services in Al Jisr

Worker rolling the white insulation layer onto a roof

In Al Jisr and need cold bitumen waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp