
Foundation waterproofing in Al Jarrari
Foundation waterproofing in Al Jarrari begins with a photo of the foundation and its buried walls, sent by call or WhatsApp. Al Jarrari lies near Bab Madinah Ash Shamal, Mayyas and Al Madani, and includes homes and small compounds where foundation depth varies.
Al Jarrari has standalone homes and small compounds, many built on foundations of differing depth. The wall that stays in contact with the soil for years is usually where dampness appears, particularly at the joint between foundation and wall. Because buildings here vary in size and design, each case is judged from its photos and the conditions around it.
- Al Jarrari is a neighbourhood in the Eastern Province, close to Bab Madinah Ash Shamal, Mayyas and Al Madani.
- The joint between foundation and wall is the point most exposed to moisture seepage in below-ground construction.
The main items of foundation waterproofing in Al Jarrari
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
- Cleaning the surface and removing loose material and oil
- Fixing protection boards over the waterproof layer before backfill
- Checking layer continuity at corners, edges and critical points
The stages of the work in Al Jarrari
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
We serve Al Jarrari and around itIncluding Bab Madinah Ash Shamal, Mayyas and Al Madani, as part of our work across the Eastern Province.
Start from Al Jarrari with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on foundation waterproofing in Al Jarrari
What decides the right type of foundation waterproofing in Al Jarrari?
Foundation depth, the condition of the wall and how much moisture the surrounding soil holds decide it. These factors are assessed from the photos first, and then a material suited to the case is chosen.
Do you treat foundation leaks in small buildings in Al Jarrari?
Yes, we treat foundations in small buildings where access allows. Send photos of where the leak is and how large it looks, and we will work out with you what can be done.
What is the difference between waterproofing foundations in a new build and in an existing building?
In a new build the walls are exposed, so the waterproof layer goes straight onto clean concrete and is protected with boards before backfill. In an existing building the ground has to be excavated to reach the wall from outside, or an internal treatment is used depending on the situation. Send site photos on WhatsApp and we will advise.
Is Al Jarrari within your service area?
Yes, Al Jarrari is one of the areas we work in, as are Bab Madinah Ash Shamal, Mayyas and Al Madani. To start, call us or message us on WhatsApp.
What do the protection boards do over the waterproof layer?
Backfill and soil movement rub against the waterproof layer and can tear it. Protection boards form a hard shield that takes that friction instead of the layer, keeping it sound and effective for longer. Fitting them is part of the correct sequence for this type of waterproofing.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
Foundation waterproofing near Al Jarrari
If the site is outside Al Jarrari, the same service is available in Bab Madinah Ash Shamal, Mayyas and Al Madani.
More services in Al Jarrari



