Abraj Al AzlContracting
Call العربية
Worker brushing cold bitumen onto a concrete surface with a long brush

Cold bitumen waterproofing in Al Jarrari

Waterproofing without a flame

Cold-applied bitumen coating by brush or roller, for foundations, bathrooms, planters and roofs

+966 54 311 2066
The service in your area

Cold bitumen waterproofing in Al Jarrari

Cold bitumen waterproofing in Al Jarrari starts with photos sent by call or WhatsApp. Houses and smaller residential buildings are typical here, with foundations, bathroom floors, planters and roofs to check. Cold bitumen is brushed or rolled on, and the photos show which surfaces suit it.

Al Jarrari is mostly houses and smaller residential buildings, with a mix of older and newer construction. A roof patched again and again, or a bathroom floor with cracks at its edges, usually needs a closer look first. Foundations and planters in contact with damp soil can be treated with cold bitumen once the surface is prepared. Whether it is the right choice depends on the surface and its moisture, and the photos decide that.

  • Al Jarrari is a district in the Eastern Province, lying close to Mayyas and Bab Madinah Ash Shamal.
  • Cold bitumen needs a dry, clean surface, so preparation decides how well a bathroom or planter coating holds.
What the service includes

The scope of the work in Al Jarrari

  • Treating cracks and joints before application
  • Applying the waterproof coating by brush or roller over the whole surface
  • Cleaning the surface and removing loose material and grease
  • Adding the protective layer on sun-exposed surfaces once dry
How we work

How we carry out cold bitumen waterproofing in Al Jarrari

1

Send photos of the area

On WhatsApp: photos of the surface to be waterproofed, any cracks, and the surrounding area, so we can decide the right treatment and material.

2

Clean and prepare the surface

The surface is cleaned of dust, oils and loose material. Cracks and joints are treated, and the surface is left to dry fully before application. A damp surface prevents the coating from bonding.

3

Apply the waterproof coating

The material is brushed or rolled over the whole surface, turned up at walls and the parapet, and closed tightly around drain openings, AC bases and any penetration. The layers applied depend on the surface condition and its location.

4

Cure and protective layer

The coating is left to dry and harden. On surfaces exposed to sun, a protective layer is added over it, because cold bitumen left bare is degraded by intense heat and ultraviolet light over time.

What sets us apart

Why Abraj Al Azl?

Penetrates pores and hairline cracksThe liquid body lets the material enter pores and hairline cracks in the concrete before it sets, forming a seal both inside and at the surface.

Al Jarrari is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Jarrari with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book cold bitumen waterproofing in Al Jarrari

Does cold bitumen suit bathroom floors in Al Jarrari?

Often yes, where the floor is sound and can be dried and cleaned first. Cracks are treated before the coating goes on, and the photos show whether the floor is ready.

Do you waterproof planters and garden walls in Al Jarrari?

Yes, we serve Al Jarrari. Send photos of the planter or wall and tell us what is grown in it or against it, so we can judge the coating needed.

Is cold bitumen suitable for outdoor planters and planting beds?

Yes. Cold bitumen is used on the inside walls of planters and planting beds to stop irrigation water reaching the adjacent walls or the surface below. It is applied to the concrete or tiles after cleaning, left to dry before the planter is filled with soil. Good ventilation of the space during application is important.

Can cold bitumen be applied over old bathroom tiles?

In some cases yes, if the tiles are firm, clean and free of grease the coating bonds over them and closes the joints. If the tiles are loose or there is moisture beneath them, they are lifted first and the concrete surface is treated. Send photos of the bathroom and we will say which way suits.

What is the difference between cold bitumen and bitumen rolls?

Bitumen rolls are a continuous sheet bonded by heat or adhesive, suited to large open surfaces. Cold bitumen is a liquid applied by brush or roller that reaches tight corners, confined areas and surfaces where rolls do not fit. The right choice depends on the location and the surface condition, and photos help us decide.

How do I request cold bitumen waterproofing in Al Jarrari?

Call us, or send clear photos of the spot and its location in Al Jarrari on WhatsApp, and we will work out the next step with you.

Nearby areas

Cold bitumen waterproofing near Al Jarrari

We also work near Al Jarrari, in Bab Madinah Ash Shamal, Mayyas and Al Madani.

Other services in the area

More services in Al Jarrari

Worker rolling the white insulation layer onto a roof

Cold bitumen waterproofing in Al Jarrari?
Call us now

Describe the problem and where it is in Al Jarrari, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp