Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Shiab

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Shiab

Bitumen bathroom waterproofing in Shiab starts with photos of the floor and lower walls, sent by call or WhatsApp. The area has small and medium houses, where bathrooms need a bitumen barrier before tiling to protect against water and moisture seepage.

Shiab is a small area with small and medium houses, where bathrooms vary by house age and design. The floor may be soil or old concrete, and concrete walls absorb water easily from the floor and surrounding pipes. Bitumen forms a tight barrier before screed and tiling, protecting foundations and outer walls from water seepage. Photos show the floor and wall condition, pipe locations and drainage points to choose the right method.

  • Shiab is a small hamlet in the Eastern Province, near Ghizlan, An Naim and the second industrial area.
  • A small house bathroom may face drainage and moisture problems because the floor and pipes may be old or tight.
What the service includes

What the service covers in Shiab

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
How we work

From first contact to the finished job in Shiab

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Shiab and around itIncluding Ghizlan, An Naim and second industrial (near Ra's Tannurah), as part of our work across the Eastern Province.

Your request from Shiab comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Shiab

Can bitumen be applied directly to a soil floor?

Bitumen can be applied to a soil floor but the floor must be clean, stable and free of standing water. If the floor is damp or unstable it may need levelling and drying first. Photos will show the condition.

Is bitumen suitable for a bathroom that takes a long time to dry?

Bitumen stops water penetrating the floor and walls, but good ventilation matters for drying the bathroom. If it is constantly damp there may be ventilation or drainage problems. Send photos so we can assess the situation.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you offer bitumen bathroom waterproofing in Shiab?

Yes. Shiab is within our service area in the Eastern Province, and we also work in Ghizlan, An Naim and second industrial (near Ra's Tannurah). Call us or send photos of the spot on WhatsApp.

Nearby areas

Areas near Shiab

We also work near Shiab, in Ghizlan, An Naim and second industrial (near Ra's Tannurah).

Other services in the area

More services in Shiab

Pool at night with water jets after waterproofing

Tell us about your site in Shiab
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp