
Bitumen bathroom waterproofing in second industrial (near Ra's Tannurah)
Bitumen bathroom waterproofing in the Second Industrial district begins with photos of the floor and lower walls sent by call or WhatsApp. The industrial zone holds buildings of varied use, where bathrooms need strong protection before construction is finalised.
Industrial and commercial buildings feature varied bathrooms in size, age and material. Bathrooms in older warehouses and offices may suffer from old leaks and persistent damp, while newer ones may need professional waterproofing from the start. Bitumen creates a robust barrier against water beneath floors and walls before screed and tiling. Photos help us understand the space and conditions before choosing the most suitable application method.
- The Second Industrial district is an industrial zone in the Eastern Province, close to Qurtubah, Al Montazah and Az Zuhur, with diverse commercial and industrial buildings.
- Bathrooms in industrial buildings face heavy use and high humidity, making bitumen as a first protection layer all the more important.
What we do for you in second industrial (near Ra's Tannurah)
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Checking the concrete floor and wall bases and identifying cracks
- Turning the layer up the walls in the wet zone and sealing the corners
From first contact to the finished job in second industrial (near Ra's Tannurah)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
We serve second industrial (near Ra's Tannurah) and around itIncluding Qurtubah (near Ra's Tannurah), Al Montazah (near Ra's Tannurah) and Az Zuhur (near Ra's Tannurah), as part of our work across the Eastern Province.
second industrial (near Ra's Tannurah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in second industrial (near Ra's Tannurah)
Can an existing industrial bathroom be waterproofed with bitumen?
This depends on the concrete and existing tiling condition. If the tile is sound and the concrete beneath is undamaged, we may be able to work on the existing base. Send clear photos so we can decide whether removal and starting fresh is needed.
What materials are used with bitumen to waterproof a Second Industrial bathroom?
Bitumen is applied to clean, sound concrete, with cracks and defects treated beforehand. After bitumen come screed and tiling per the building's specification. Photos and our call determine which materials suit your case.
Do you cover second industrial (near Ra's Tannurah)?
Yes. We serve second industrial (near Ra's Tannurah) and nearby areas such as Qurtubah (near Ra's Tannurah), Al Montazah (near Ra's Tannurah) and Az Zuhur (near Ra's Tannurah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Areas near second industrial (near Ra's Tannurah)
Nearby areas we also cover: Qurtubah (near Ra's Tannurah), Al Montazah (near Ra's Tannurah) and Az Zuhur (near Ra's Tannurah).
More services in second industrial (near Ra's Tannurah)




