Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in An Naim

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in An Naim

Bitumen bathroom waterproofing in An Naim starts with photos of the floor and walls sent to us by call or WhatsApp. The district contains villas and residential blocks of varying age, and the bathroom may be new or need renewal before any further construction work begins.

An Naim has a mix of older villas and newer apartment blocks, so bathroom conditions vary accordingly. An old villa's bathroom may need cracks and leaks repaired before bitumen is applied, while a newer block may only need base lining before tiles go down. Moisture from the nearby coast can affect the walls, and photos show each bathroom's state so the right steps can be chosen.

  • An Naim is a district in the Eastern Province, near Qurtubah, Az Zuhur and Al Fayha, with villas and residential apartment blocks.
  • The bathroom floor and walls around the base must be sealed before tiling, and bitumen prevents water reaching the concrete beneath.
What the service includes

What the service covers in An Naim

  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
How we work

From first contact to the finished job in An Naim

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from An Naim comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from An Naim with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in An Naim

Is bitumen alone enough to waterproof a bathroom in An Naim or do we need other layers?

Bitumen is the base lining that goes on just before tiling. The base must be sound, cracks are repaired first, and walls may need an extra layer depending on the condition the photos reveal.

How do you start a bathroom waterproofing job in An Naim?

We ask for clear photos of the floor, walls, joints and corners. After we call and review them, we tell you what must be done before the bitumen is applied.

What should I send you from An Naim?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Naim, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

We also work near An Naim, in Qurtubah (near Ra's Tannurah), Az Zuhur (near Ra's Tannurah) and Al Fayha (near Ra's Tannurah).

Other services in the area

More services in An Naim

Pool at night with water jets after waterproofing

Your first step in An Naim:
a call or a WhatsApp message

Describe the problem and where it is in An Naim, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp