
Bitumen bathroom waterproofing in second industrial (near Dhahran)
Bitumen bathroom waterproofing in the Second Industrial district begins with photos sent by call or WhatsApp. The area has industrial and service buildings plus small villas, and the bathroom needs reliable waterproofing before tiling.
The Second Industrial area has industrial and service buildings alongside small residential villas and some warehouses. Bathrooms in industrial and service buildings may face greater stress from heavy daily use and high humidity, while small villas need strong standard waterproofing. In industrial buildings, floors may be thick concrete with multiple drain pipes around the bathroom. Bitumen provides a reliable protective layer on the floor and lower walls before tiles and screed. Photos clarify the building type and use.
- The Second Industrial district is an industrial area in the Eastern Province near Al Jud and Al Hazm, with industrial and service buildings plus small villas.
- Bathrooms in industrial buildings need strong waterproofing that tolerates heavy use, high humidity and temperature swings.
The main items of bitumen bathroom waterproofing in second industrial (near Dhahran)
- Closing the waterproofing around drain openings and pipe entries
- Confirming full drying before the screed is poured
- Cleaning the surface and treating cracks and corners before application
- Applying bitumen layers over the floor including the shower area
This is how we work in second industrial (near Dhahran)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
second industrial (near Dhahran) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve second industrial (near Dhahran) and around itIncluding Al Jud, Al Hazm (near Dhahran) and Al Iskan Al Janubi, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in second industrial (near Dhahran)
Does a factory bathroom waterproofing differ from a villa bathroom in the Second Industrial?
Yes, factory bathrooms may need stronger layers or special treatment for heavy use and intense humidity. Photos show us the building type and expected load so we can choose the right method.
Does bitumen resist cleaning chemicals in a factory bathroom?
Bitumen is resistant to most standard factory cleaners, but very strong chemicals may affect it. Tell us what chemicals are used in photos or by call so we can recommend appropriate protection.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
What should I send you from second industrial (near Dhahran)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in second industrial (near Dhahran), and we will work out the next step with you.
We also offer it in neighbouring areas
If the site is outside second industrial (near Dhahran), the same service is available in Al Jud, Al Hazm (near Dhahran) and Al Iskan Al Janubi.
More services in second industrial (near Dhahran)




