Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in second industrial (near Dhahran)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in second industrial (near Dhahran)

Bathroom waterproofing in the Second Industrial begins with photos sent via WhatsApp of the bathroom and its wet areas. The Second Industrial comprises commercial buildings, workshops and sometimes worker housing, and many bathrooms there need protection from leaks before tiling.

Bathrooms in the Second Industrial vary by building type; commercial buildings may have staff bathrooms with fixed dimensions, and workshops may have simple bathrooms subject to heavy use. Heavy use means water tests the waterproofing repeatedly, so the membrane must be strong and continuous with no gaps. A commercial bathroom may have multiple outlets or large pipes needing special care during sealing. Send photos from different angles so we understand the space and how it is used.

  • The Second Industrial is an industrial district in the Eastern Province, near Al Jud, Al Hazm and Al Iskan Al Janubi, with commercial buildings and workshops.
  • A heavily used bathroom needs robust waterproofing that tolerates repeated daily use.
What the service includes

The main items of bathroom waterproofing before tiling in second industrial (near Dhahran)

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The steps of bathroom waterproofing before tiling in second industrial (near Dhahran)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from second industrial (near Dhahran) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

second industrial (near Dhahran) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in second industrial (near Dhahran)

Does waterproofing for workshop bathrooms differ from commercial building bathrooms?

The principle is the same, but usage may be heavier in a workshop. A heavily used bathroom needs strong waterproofing with no weak spots anywhere, and your photos show us the usage level and current condition.

If a workshop bathroom shows leakage under the floor, can it be repaired?

It depends on the cause of the leak. Your photos will show whether it comes from concrete cracks, weak waterproofing or a pipe problem. Then we tell you the appropriate solution.

Is second industrial (near Dhahran) within your service area?

Yes, second industrial (near Dhahran) is one of the areas we work in, as are Al Jud, Al Hazm (near Dhahran) and Al Iskan Al Janubi. To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Nearby areas

Bathroom waterproofing before tiling near second industrial (near Dhahran)

We also offer bathroom waterproofing before tiling in Al Jud, Al Hazm (near Dhahran) and Al Iskan Al Janubi, among the closest areas to second industrial (near Dhahran).

Other services in the area

More services in second industrial (near Dhahran)

Worker applying the white insulation layer on a villa roof by the sea

We start with you in second industrial (near Dhahran)
with one call

Describe the problem and where it is in second industrial (near Dhahran), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp