
Bitumen bathroom waterproofing in Al Iskan Al Janubi
Bitumen bathroom waterproofing in Al Iskan Al Janubi concerns the floors and wall bases of bathrooms in houses and apartment blocks, before screed and tiles are laid. Because flat bathrooms often share walls and risers with neighbouring units, we plan access from the start once you send photos through WhatsApp or call us.
Al Iskan Al Janubi is a residential district with a mix of standalone houses on modest plots and apartment buildings. In flats, bathroom floors sit above other homes and the pipes run up through shared shafts, so the bitumen work has to be planned around them. In houses, the bathroom is often at ground level with a separate courtyard drain. The photos you send show which case applies.
- Al Iskan Al Janubi is a district of the Eastern Province, lying close to Al Urubah and Al Hazm.
- Flats share pipe shafts, so waterproofing work often needs access arranged with neighbours.
The main items of bitumen bathroom waterproofing in Al Iskan Al Janubi
- Checking the concrete floor and wall bases and identifying cracks
- Cleaning the surface and treating cracks and corners before application
- Turning the layer up the walls in the wet zone and sealing the corners
- Closing the waterproofing around drain openings and pipe entries
The stages of the work in Al Iskan Al Janubi
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Al Iskan Al Janubi is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Your request from Al Iskan Al Janubi comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Al Iskan Al Janubi
Will work in a flat disturb the neighbours below?
The work is confined to your bathroom floor and wall bases, but dust and water can carry down through the slab if the area is not sealed. We agree on protection and timing with you before starting.
Can bitumen be used in a ground-floor house bathroom?
Yes, the method is generally suited to ground-floor bathrooms in houses. Whether it fits your slab, drain and existing tiles depends on what the photos show, so send them of the floor and the outlet.
How do I request bitumen bathroom waterproofing in Al Iskan Al Janubi?
Call us, or send clear photos of the spot and its location in Al Iskan Al Janubi on WhatsApp, and we will work out the next step with you.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Areas near Al Iskan Al Janubi
We also work near Al Iskan Al Janubi, in Al Urubah (near Dhahran), Al Hazm (near Dhahran) and Al Iskan Al Shimali.
More services in Al Iskan Al Janubi




