
Bitumen bathroom waterproofing in Qurtubah (near Qaryah al Ulya)
Bitumen bathroom waterproofing in Qurtubah begins with photos of the floor and walls sent by call or WhatsApp. The district has varied villas and houses, and their bathrooms differ depending on building age and interior layout.
Qurtubah has houses and villas of different sizes and ages, and their bathrooms vary in base and surface. Older homes may show damp marks around the bathroom or under tiles, while newer ones may have a clean surface but need preventive protection. Bitumen treats existing damp and forms a shield before screed and tiles are laid. Photos show the surface condition and whether there are cracks or prior water.
- Qurtubah is a residential district in Hofuf, Eastern Province, lying close to Al Wahah, Az Zuhur and Al Muruj.
- Villas and houses with gardens may face seepage from percolating water outside, so internal waterproofing protects the bathroom base.
What we do for you in Qurtubah (near Qaryah al Ulya)
- Checking the concrete floor and wall bases and identifying cracks
- Turning the layer up the walls in the wet zone and sealing the corners
- Cleaning the surface and treating cracks and corners before application
- Confirming full drying before the screed is poured
From first contact to the finished job in Qurtubah (near Qaryah al Ulya)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Bitumen bathroom waterproofing in Qurtubah (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.
Qurtubah (near Qaryah al Ulya) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen bathroom waterproofing in Qurtubah (near Qaryah al Ulya)
Can an old bathroom be waterproofed with bitumen without removing existing tiles?
No, old tiles and screed must be removed to reach the base surface. Send photos of the bathroom and tell us its age so we can determine whether the underlying screed is sound or needs repair before waterproofing.
Does bitumen stop rising damp from underground in Qurtubah?
Yes, bitumen blocks damp rising from below and protects the bathroom from upward water. But if damp is severe, the photos will show it and we may advise you on additional steps.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
What should I send you from Qurtubah (near Qaryah al Ulya)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Qurtubah (near Qaryah al Ulya), and we will work out the next step with you.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Areas near Qurtubah (near Qaryah al Ulya)
Nearby areas we also cover: Al Wahah (near Qaryah al Ulya), Az Zuhur (near Qaryah al Ulya) and Al Muruj (near Qaryah al Ulya).
More services in Qurtubah (near Qaryah al Ulya)




