
Bitumen bathroom waterproofing in Al Muruj (near Qaryah al Ulya)
Bitumen bathroom waterproofing in this Al Muruj district, close to Qaryah al Ulya, Az Zuhur and Ar Rawdah, begins with photos sent by call or WhatsApp. From them we locate risk points in the floor and walls before any work starts.
This Al Muruj district in Al Ahsa includes a mix of residential buildings, from large villas to small apartments in blocks. Older bathrooms sometimes show cracked floors or dampness at the inner wall, while newer ones need a continuous layer under the screed. Because spaces vary, the solution depends on the room's size and position, which the photos reveal.
- This Al Muruj is a second residential district in Al Ahsa in the Eastern Province, close to Qaryah al Ulya, Az Zuhur and Ar Rawdah.
- A bathroom not waterproofed beneath the screed is hard to repair later without breaking the tiles.
What we do for you in Al Muruj (near Qaryah al Ulya)
- Turning the layer up the walls in the wet zone and sealing the corners
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
- Applying bitumen layers over the floor including the shower area
The steps of bitumen bathroom waterproofing in Al Muruj (near Qaryah al Ulya)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Al Muruj (near Qaryah al Ulya) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Al Muruj (near Qaryah al Ulya) and around itIncluding Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Muruj (near Qaryah al Ulya)
Do you waterproof small apartments in Al Muruj blocks?
Yes, both apartments and villas. Send photos of the bathroom and tell us whether it is on the ground or upper floor so we can understand what lies beneath it.
How do you tell whether a bathroom in this district needs waterproofing?
Through dampness at the inner wall, floor cracks, or leakage to the floor below. The photos show the cause, which may be a local repair rather than full waterproofing.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
What should I send you from Al Muruj (near Qaryah al Ulya)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Muruj (near Qaryah al Ulya), and we will work out the next step with you.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
The same service in nearby areas
We also offer bitumen bathroom waterproofing in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), among the closest areas to Al Muruj (near Qaryah al Ulya).
More services in Al Muruj (near Qaryah al Ulya)




