Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Muruj (near Qaryah al Ulya)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Muruj (near Qaryah al Ulya)

Bitumen bathroom waterproofing in this Al Muruj district, close to Qaryah al Ulya, Az Zuhur and Ar Rawdah, begins with photos sent by call or WhatsApp. From them we locate risk points in the floor and walls before any work starts.

This Al Muruj district in Al Ahsa includes a mix of residential buildings, from large villas to small apartments in blocks. Older bathrooms sometimes show cracked floors or dampness at the inner wall, while newer ones need a continuous layer under the screed. Because spaces vary, the solution depends on the room's size and position, which the photos reveal.

  • This Al Muruj is a second residential district in Al Ahsa in the Eastern Province, close to Qaryah al Ulya, Az Zuhur and Ar Rawdah.
  • A bathroom not waterproofed beneath the screed is hard to repair later without breaking the tiles.
What the service includes

What we do for you in Al Muruj (near Qaryah al Ulya)

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
How we work

The steps of bitumen bathroom waterproofing in Al Muruj (near Qaryah al Ulya)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Muruj (near Qaryah al Ulya) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Muruj (near Qaryah al Ulya) and around itIncluding Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Muruj (near Qaryah al Ulya)

Do you waterproof small apartments in Al Muruj blocks?

Yes, both apartments and villas. Send photos of the bathroom and tell us whether it is on the ground or upper floor so we can understand what lies beneath it.

How do you tell whether a bathroom in this district needs waterproofing?

Through dampness at the inner wall, floor cracks, or leakage to the floor below. The photos show the cause, which may be a local repair rather than full waterproofing.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What should I send you from Al Muruj (near Qaryah al Ulya)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Muruj (near Qaryah al Ulya), and we will work out the next step with you.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

The same service in nearby areas

We also offer bitumen bathroom waterproofing in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), among the closest areas to Al Muruj (near Qaryah al Ulya).

Other services in the area

More services in Al Muruj (near Qaryah al Ulya)

Pool at night with water jets after waterproofing

We start with you in Al Muruj (near Qaryah al Ulya)
with one call

Describe the problem and where it is in Al Muruj (near Qaryah al Ulya), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp