
Bitumen bathroom waterproofing in Az Zuhur (near Qaryah al Ulya)
Bitumen bathroom waterproofing in Az Zuhur starts with clear photos of the bathroom floor and lower walls, sent by call or WhatsApp. Az Zuhur is an area of villas and residential buildings, each bathroom needing a waterproof layer before final tiling and plumbing.
Az Zuhur comprises villas and diverse residential buildings with bathrooms of different designs and ages. A new bathroom may need comprehensive waterproofing from scratch, while an older one may need limited renewal before re-tiling. Daily steam and water impose high moisture on the bathroom floor and base, and the bitumen layer protects the concrete from cracking and damp. Your photos show us the design type and current condition, so we choose the suitable method and right material.
- Az Zuhur is a district in the Eastern Province, close to Qaryah al Ulya, Al Muruj and Ar Rawdah.
- A bathroom with older pipes or slow drainage may need stronger waterproofing and additional inspection.
The main items of bitumen bathroom waterproofing in Az Zuhur (near Qaryah al Ulya)
- Closing the waterproofing around drain openings and pipe entries
- Cleaning the surface and treating cracks and corners before application
- Applying bitumen layers over the floor including the shower area
- Turning the layer up the walls in the wet zone and sealing the corners
This is how we work in Az Zuhur (near Qaryah al Ulya)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Start from Az Zuhur (near Qaryah al Ulya) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Bitumen bathroom waterproofing in Az Zuhur (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen bathroom waterproofing in Az Zuhur (near Qaryah al Ulya)
What is the difference between waterproofing a new bathroom and an old one in Az Zuhur?
A new bathroom starts from scratch with a uniform bitumen layer on clean concrete. An old bathroom may show cracks and damp patches, which we repair first before re-waterproofing. Your photos clearly show which case applies to you.
Can an old bathroom in Az Zuhur be waterproofed without removing the existing tiles?
If the damp comes from under the tiles, removing them is necessary to reach the floor and waterproof it properly. Your photos show us where the moisture is coming from, helping us decide if that is possible.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
How do I request bitumen bathroom waterproofing in Az Zuhur (near Qaryah al Ulya)?
Call us, or send clear photos of the spot and its location in Az Zuhur (near Qaryah al Ulya) on WhatsApp, and we will work out the next step with you.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Areas near Az Zuhur (near Qaryah al Ulya)
We also offer bitumen bathroom waterproofing in Qaryah al Ulya, Al Muruj (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), among the closest areas to Az Zuhur (near Qaryah al Ulya).
More services in Az Zuhur (near Qaryah al Ulya)




