Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qalt

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qalt

Bitumen bathroom waterproofing in Al Qalt starts with photos sent by call or WhatsApp. The hamlet has small houses on narrow plots, and each one needs its bathroom floor shielded from water seepage before screed and tiling.

Small houses in Al Qalt are built on tight plots, and their bathrooms sit close to the surface or near groundwater. Moisture penetrates floors easily, and bitumen forms a barrier that stops bathroom water from reaching the soil or walls. Old floors may show cracks or discoloration from wetness, and photos show clearly what needs treatment before waterproofing.

  • Al Qalt is a hamlet in the Eastern Province, near Darb Al Ibil and An Nazim, with small houses on narrow plots.
  • Small houses on tight plots suffer from shallow groundwater, so bitumen must be thick and comprehensive under the bathroom.
What the service includes

What the service covers in Al Qalt

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Al Qalt

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Qalt with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Qalt comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Qalt

Does bitumen stop water coming up through the bathroom floor in Al Qalt?

Bitumen protects against water seeping from use on top of the floor, but water rising from below is a deeper problem. Send a photo and tell us if you notice rising damp, and we will assess whether bitumen alone is enough or if further treatment is needed.

How thick should the bitumen layer be before tiling in a bathroom?

Thickness depends on the condition of the concrete floor and the water level around the house. Photos and a call clarify the situation, and then we tell you the thickness needed to ensure adequate protection.

Do you offer bitumen bathroom waterproofing in Al Qalt?

Yes. Al Qalt is within our service area in the Eastern Province, and we also work in Darb Al Ibil, An Nazim and Al-Barazi. Call us or send photos of the spot on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Darb Al Ibil, An Nazim and Al-Barazi.

Other services in the area

More services in Al Qalt

Pool at night with water jets after waterproofing

Tell us about your site in Al Qalt
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp