Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Darb Al Ibil

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Darb Al Ibil

Bitumen bathroom waterproofing in Darb Al Ibil starts with photos of the bathroom or walls sent by call or WhatsApp. The hamlet contains scattered houses and villas, where the bathroom needs protection before the screed and tiling go down.

The scattered houses and villas in Darb Al Ibil face moisture that can affect bathrooms, especially around wet areas and floors. Bitumen creates a strong barrier layer that blocks water seeping into lower layers and protects the structure from damp. The method differs depending on the base condition and whether the bathroom is new or being renovated. Photos show the state of the walls and floor before the application method is chosen.

  • Darb Al Ibil is a hamlet in the Eastern Province, close to Al Qalt, An Nazim and Al-Barazi, made up of scattered houses and villas.
  • A bathroom in a house or villa faces daily moisture, so protection must begin before the internal construction is finished.
What the service includes

The bitumen bathroom waterproofing work in Darb Al Ibil

  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Closing the waterproofing around drain openings and pipe entries
How we work

This is how we work in Darb Al Ibil

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Darb Al Ibil comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Darb Al Ibil with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Darb Al Ibil

When should a bathroom floor be waterproofed with bitumen?

Before laying the concrete screed and tiling. If you are renovating an existing bathroom, you will need to remove the tiles first; the photos show the base condition to determine what is needed.

Does bitumen protect bathroom walls from damp in Darb Al Ibil?

Yes, especially at the wall base and corners where water collects. We serve the hamlet and the scattered homes around it; send photos of damp walls so we can identify areas needing protection.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is Darb Al Ibil within your service area?

Yes, Darb Al Ibil is one of the areas we work in, as are Al Qalt, An Nazim and Al-Barazi. To start, call us or message us on WhatsApp.

Nearby areas

Areas near Darb Al Ibil

We also work near Darb Al Ibil, in Al Qalt, An Nazim and Al-Barazi.

Other services in the area

More services in Darb Al Ibil

Pool at night with water jets after waterproofing

Tell us about your site in Darb Al Ibil
and we will plan the next step with you

Describe the problem and where it is in Darb Al Ibil, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp