Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al-Barazi

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al-Barazi

Bitumen bathroom waterproofing in Al-Barazi begins with photos of the floor and walls sent by call or WhatsApp. The hamlet has small tightly spaced houses with attached rooms, where bathrooms are usually compact and linked to the main home. Bitumen is laid beneath screed and tiling to protect the building from water seepage and damp.

Most Al-Barazi homes are built in traditional style and their close spacing increases humidity on shared walls. A small bathroom may hold moisture more than others because ventilation is limited and water pools easily. Rare but heavy rain can penetrate soil around the house and raise damp from beneath the floor. Bitumen blocks water from below and around the lower walls together. Photos show us whether moisture is present now and where it is seeping from.

  • Al-Barazi is a hamlet in the Eastern Province near An Nazim, Darb Al Ibil, and Al Qalt, with small tightly spaced houses.
  • In a closely built hamlet, houses share damp problems, so horizontal waterproofing under the floor protects inner walls from moisture.
What the service includes

The scope of the work in Al-Barazi

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Al-Barazi

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al-Barazi comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al-Barazi and around itIncluding An Nazim, Darb Al Ibil and Al Qalt, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al-Barazi

Why does water collect in a bathroom in Al-Barazi more than in other rooms?

A small bathroom with still air and high damp from the ground make steam condense easily. Horizontal bitumen waterproofing beneath the floor stops moisture rising from the soil.

Can a bathroom in an old Al-Barazi house be waterproofed without removing the tiles?

If the floor and lower walls have failed old waterproofing beneath them, the tiles must come up first so new bitumen can be applied. Photos will show us if the structure under them is sound.

How do I request bitumen bathroom waterproofing in Al-Barazi?

Call us, or send clear photos of the spot and its location in Al-Barazi on WhatsApp, and we will work out the next step with you.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al-Barazi, the same service is available in An Nazim, Darb Al Ibil and Al Qalt.

Other services in the area

More services in Al-Barazi

Pool at night with water jets after waterproofing

Tell us about your site in Al-Barazi
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp