Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Bakha

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Bakha

Bitumen bathroom waterproofing in Bakha starts with WhatsApp photos of the floor, walls and bathroom surroundings. Bakha is a small hamlet with clustered houses whose bathrooms need bitumen waterproofing before tiling to prevent water and damp reaching the building.

Bakha is a small hamlet where houses cluster close together, each with one or more bathrooms. Bathrooms surrounded by concrete walls and floors face high daily moisture, and leaking water can reach foundations and adjacent walls. In these relatively crowded areas, water seeping from one house may affect nearby ones. Bitumen is laid on floors and walls before tiles and screed, forming a tight barrier against water.

  • Bakha is a hamlet in the Eastern Province, close to Maghati, Hanidh and Al Hulaysiyah, with a cluster of houses.
  • In crowded hamlets, water leaking from one bathroom may spread to neighbouring foundations more readily.
What the service includes

What we do for you in Bakha

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

From first contact to the finished job in Bakha

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Bakha is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Bakha and around itIncluding Maghati, Hanidh and Al Hulaysiyah, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Bakha

Why is bitumen essential in a Bakha bathroom before tiling?

Because excess water from showering and cleaning may seep through screed and tiles into concrete and foundations. In a crowded hamlet, this can affect neighbouring houses too. Bitumen stops this seepage.

Does applying bitumen in Bakha take a long time?

The time depends on bathroom size and temperature and moisture conditions. Photos and measurements via WhatsApp help give a better idea, and the team will explain the steps after your call.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I request bitumen bathroom waterproofing in Bakha?

Call us, or send clear photos of the spot and its location in Bakha on WhatsApp, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Areas near Bakha

We also offer bitumen bathroom waterproofing in Maghati, Hanidh and Al Hulaysiyah, among the closest areas to Bakha.

Other services in the area

More services in Bakha

Pool at night with water jets after waterproofing

Tell us about your site in Bakha
and we will plan the next step with you

Describe the problem and where it is in Bakha, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp